Quick answers
What is this project?
Regarding Transfer of EC of our Existing Masonry Stone Mining Project, M.L. No.:- 127/2007. Area: 1.0Hect. Near Village: - Asotra Tehsil- Panchpdra District- Balotra(Raj.) in name of Kheta Ram to M/s Shri Naganaray Construction Company is a lapsed mining project in Muthli, Siwana, Barmer, Rajasthan. The site covers 2.5 acres.
Who is building it?
The applicant is Jitendra Singh.
Has it been approved?
No. The application was lapsed on 29 Oct 2024, so it is no longer under consideration.
Where is it?
In Muthli, Siwana, Barmer, Rajasthan.
How big is it?
It has a stated cost of ₹20 lakh and a site of 2.5 acres.
When was it filed?
The application was filed on 1 Aug 2024.
Project details
| Status | Lapsed |
|---|---|
| Status since | 29 Oct 2024 |
| Application filed | 1 Aug 2024 |
| Approval sought | Environmental approval |
| Application type | Ownership transfer |
| Sector | Mining |
| Applicant | Jitendra Singh |
| Land area | 2.5 acres (1 ha) |
| Project cost | ₹20 lakh |
| Village / locality | Muthli |
| Taluk / tehsil | Siwana |
| District | Barmer |
| State | Rajasthan |
| Location from | Site boundary on record |
| Our reference | WID-RJ-14998 |
In context
878 applications in Barmer since January 2022 are in the same category (Mining): 465 approved, 100 filed or under review, and 313 withdrawn, lapsed or rejected. The approved ones took a median of 6 months from filing to approval. At 2.5 acres, this one is smaller than 97% of them.
1 other mining lease has applied within 500 m of this site; together with this one they cover 4.9 acres. Under India's environmental rules, mining leases less than 500 m apart are assessed together as one cluster, so the combined area can decide which clearance is needed. 9 mining leases have applied within 5 km.
Where it is
Muthli, Siwana, Barmer, Rajasthan. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Re -appraisal our Existing masonry stone Mining project EC granted DEIIAA… — environmental approval granted, 0 m away
- Re-Appraisal of Environmental Clearance Granted by Deiaa Barmer (Rajsthan) of… — lapsed, 150 m away
- Re-Appraisal of Environmental Clearance Granted by Deiaa Barmer (Rajasthan) of… — lapsed, 2.4 km away
- Re-Appraisal of Environmental Clearance Granted by Deiaa Barmer (Rajasthan) of… — lapsed, 2.5 km away
- Re-Appraisal of Environmental Clearance Granted by Deiaa Barmer(Rajasthan) of… — lapsed, 3.1 km away
- Re-Appraisal of Environmental Clearance Granted by Deiaa Barmer (Rajasthan) of… — lapsed, 3.6 km away
- Re-Apprasial Environmental Clearance by Deiaa Barmer (Rajathan) of Our… — lapsed, 4.1 km away
- Re-Appraisal of Environmental Clearance Granted by Deiaa Barmer(Rajasthan) of… — environmental approval granted, 4.2 km away
More from Jitendra Singh in Barmer
- Regarding Transfer of EC of our Existing Masonry Stone Mining Project, M.L.… — lapsed
- Re -appraisal our Existing masonry stone Mining project EC granted DEIIAA… — environmental approval granted
- Re -appraisal our Existing masonry stone Mining project EC granted DEIIAA… — environmental approval granted