Quick answers
What is this project?
Existing Residential Township project promoted by M/s. NLC India Limited- 'Navratna' - Government of India Enterprise. The project is at Khasra No. 165, 169, 170, 171, 172, 174, 175, 141, 177, 130, 131, 132, 134, 135, 136, 137, 141, 504, 505, 506, 507, 508, 509, 510, Village-Barsingsar, Tehsil-Bikaner, District Bikaner, Rajasthan is a proposed residential project in Barsinghsar, Bikaner, Rajasthan. The site covers 141.4 acres.
Who is building it?
The applicant is S Vijaya Kumar.
Has it been approved?
Yes. Its status is “Cleared for impact study” (since 25 Sept 2024), as of 27 Nov 2026.
Where is it?
In Barsinghsar, Bikaner, Rajasthan.
How big is it?
It has a stated cost of ₹27.3 crore and a site of 141.4 acres.
When was it filed?
The application was filed on 17 Sept 2024.
One of 3 filings for this project. The project's main page, with every filing and where each stands: Existing Residential Township project promoted by M/s. NLC India Limited- 'Navratna' -…
Project details
| Status | Cleared for impact study |
|---|---|
| Status since | 25 Sept 2024 |
| Application filed | 17 Sept 2024 |
| Approval sought | Environmental approval |
| Application type | Early planning |
| Sector | Buildings & townships |
| Applicant | S Vijaya Kumar |
| Use | Residential |
| Land area | 141.4 acres (57.2 ha) |
| Built-up area | 31,021 m² (3,33,907 sq ft) |
| Project cost | ₹27.3 crore |
| Village / locality | Barsinghsar |
| Taluk / tehsil | Bikaner |
| District | Bikaner |
| State | Rajasthan |
| Location from | Site boundary on record |
| Our reference | WID-RJ-15301 |
All filings for this project
This project has 3 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| Amendment filed 3 Jul 2025 | Environmental approval granted | 141.4 acres | ₹27.3 crore |
| New project filed 17 Jan 2025 | Environmental approval granted | 141.4 acres | ₹27.3 crore |
| Early planning filed 17 Sept 2024 (this page) | Cleared for impact study | 141.4 acres | ₹27.3 crore |
In context
8 applications in Bikaner since January 2022 are in the same category (Buildings & townships): 6 approved, 0 filed or under review, and 2 withdrawn, lapsed or rejected. The approved ones took a median of 4 months from filing to approval.
1 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Barsinghsar, Bikaner, Rajasthan. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Existing Residential Township project promoted by M/s. NLC India Limited-… — environmental approval granted, 0 m away
- Existing Residential Township project promoted by M/s. NLC India Limited-… — environmental approval granted, 0 m away
- Barsingsar Opencast Lignite Mine of Capacity 2.1 Mtpa in Mine Lease Area of… — more information requested, 4 km away
- Regarding Transfer of EC of our Ball Clay, Silica Sand, Murrum Mining Project;… — environmental approval granted, 5.5 km away
- EC Re-appraisal of Existing Bajri & Gravel Mining Lease (M.L. No. – 37/2010… — environmental approval granted, 6 km away
- Proposed Murrum, Gravel, Silica, Sand, Ball Clay Mining Project, M.L.Ref. No.-… — lapsed, 7.5 km away
- Proposed Bajri, Gravel, Murrum, Silia Sand Mining Project, (Ref No.-… — more information requested, 8.7 km away
- This is a Fresh Proposal for "Ball Clay, Silica Sand, Bajri, Gravel & Murrum… — environmental approval granted, 10.6 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.