Project details
| Official title | Re-Appraisal of EC Granted from DEIAA Nagaur To SEIAA, Rajasthan for Existing "China Clay (Minor Mineral) mining project" for [M.L. No.– 05/2012] over an Area of 4.1701 Hectare with Existing Production Capacity– 32,130 TPA located at Near Village– Phalki, Tehsil- Merta, District- Nagaur (Rajasthan) by M/s Shree Baba Ramdev Minchem. |
|---|---|
| Status | Environmental approval granted |
| Status since | 24 Dec 2024 |
| Application filed | 26 Jun 2024 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Mining |
| Applicant | Shyam Lal |
| Land area | 10.3 acres (4.2 ha) |
| Project cost | ₹60 lakh |
| Village / locality | Phalki |
| Taluk / tehsil | Riyan Badi |
| District | Nagaur |
| State | Rajasthan |
| Location from | Site boundary on record |
| Our reference | WID-RJ-15324 |
In context
2,161 applications in Nagaur since January 2022 are in the same category (Mining): 1,274 approved, 95 filed or under review, and 792 withdrawn, lapsed or rejected. The approved ones took a median of 4 months from filing to approval. At 10.3 acres, this one is larger than 88% of them.
1 other mining lease has applied within 500 m of this site; together with this one they cover 20.3 acres. Under India's environmental rules, mining leases less than 500 m apart are assessed together as one cluster, so the combined area can decide which clearance is needed. 3 mining leases have applied within 5 km.
Where it is
Phalki, Riyan Badi, Nagaur, Rajasthan. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- This is an existing mining lease for "Re-Appraisal of EC Granted from DEIAA… — lapsed, 250 m away
- China Clay Minor Mineral Block Mining Project, Project area of 2.8747 ha — environmental approval granted, 4.7 km away
- China Clay Minor Mineral Block Mining Project, Project area of 2.8747 ha — withdrawn, 4.7 km away
- Reappraisal of Earlier Granted EC by DEIAA, (Raj.) with Production Capacity… — lapsed, 4.8 km away
- Re- appraisal of Environment Clearance granted by DEIAA to SEIAA in compliance… — environmental approval granted, 9.6 km away
- Limestone Mining Lease, ML No- 95/1997, area-2.9535 ha, at khasra no… — lapsed, 9.6 km away
- RE- APPRASIAL Bitan Lime Stone Mine (Minor Mineral) Mining Project, M.L. No.-… — environmental approval granted, 10.1 km away
- Expansion Bitan Lime Stone Mine (Minor Mineral) Mining Project, M.L. No.-… — environmental approval granted, 10.1 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.