What is Developing? Open the mapMap

Cleared for impact studyMining · Bhilwara, Rajasthan

Proposed Project of Granite Mining (M.L. No. 171/2022, Area: 1.4270 ha) Production Capacity 1,74,580 TPA, N/v– Goma Ka Badiya, Tehsil –Kareda, District – Bhilwara (Rajasthan) By Shri Sohan Lal Sharma S/o Shri Nanuram Sharma.

Proposed Project of Granite Mining (M.L. No. 171/2022, Area: 1.4270 ha) Production Capacity 1,74,580 TPA, N/v– Goma Ka Badiya, Tehsil –Kareda, District – Bhilwara (Rajasthan) By Shri Sohan Lal Sharma S/o Shri Nanuram Sharma is a proposed mining project in Gomaka Badiya, Kareda, Bhilwara, Rajasthan. The site covers 3.5 acres. Its stated project cost is ₹1.5 crore. As of 27 Nov 2026, its status is “Cleared for impact study” (since 6 Jun 2024).

See it on the live map All projects in Bhilwara

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

One of 2 filings for this project. The project's main page, with every filing and where each stands: Proposed Project of Granite Mining (M.L. No. 171/2022, Area: 1.4270 ha) Production…

Project details

StatusCleared for impact study
Status since6 Jun 2024
Application filed22 Mar 2024
Approval soughtEnvironmental approval
Application typeEarly planning
SectorMining
ApplicantAjay Sharma
Land area3.5 acres (1.4 ha)
Project cost₹1.5 crore
Village / localityGomaka Badiya
Taluk / tehsilKareda
DistrictBhilwara
StateRajasthan
Location fromSite boundary on record
Our referenceWID-RJ-16029

All filings for this project

This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):

FilingStatusLandCost
New project filed 20 Dec 2024Environmental approval granted3.5 acres₹1.5 crore
Early planning filed 22 Mar 2024 (this page)Cleared for impact study3.5 acres₹1.5 crore

In context

2,489 applications in Bhilwara since January 2022 are in the same category (Mining): 1,323 approved, 124 filed or under review, and 1,042 withdrawn, lapsed or rejected. The approved ones took a median of 5 months from filing to approval. At 3.5 acres, this one is smaller than 61% of them.

6 other mining leases have applied within 500 m of this site; together with this one they cover 31.3 acres. Under India's environmental rules, mining leases less than 500 m apart are assessed together as one cluster, so the combined area can decide which clearance is needed. 14 mining leases have applied within 5 km.

Where it is

Gomaka Badiya, Kareda, Bhilwara, Rajasthan. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.