Project details
| Official title | "Reappraisal of EC from DEIAA to SEIAA" Existing Masonry stone Mining Project (M.L Area- 1.00ha. and ML No.-145/1990 with production capacity of 50,000 TPA (ROM) located at Near Village-Bavri, Tehsil-Jaipur, District-Jaipur, State-Rajasthan by Shri Giriraj Singh. |
|---|---|
| Status | Environmental approval granted |
| Status since | 21 Feb 2025 |
| Application filed | 27 Aug 2024 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Mining |
| Applicant | Giriraj Singh |
| Land area | 2.5 acres (1 ha) |
| Project cost | ₹20 lakh |
| Village / locality | Bauri |
| Taluk / tehsil | Jaipur |
| District | Jaipur |
| State | Rajasthan |
| Location from | Site boundary on record |
| Our reference | WID-RJ-16265 |
In context
1,151 applications in Jaipur since January 2022 are in the same category (Mining): 726 approved, 60 filed or under review, and 365 withdrawn, lapsed or rejected. The approved ones took a median of 5 months from filing to approval. At 2.5 acres, this one is smaller than 97% of them.
No other mining lease on record is within 500 m of this site; 7 have applied within 5 km.
Where it is
Bauri, Jaipur, Rajasthan. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Expansion in Production capacity of Earlier Granted EC Proposed from 50,000… — lapsed, 0 m away
- Re Appraisal of EC Granted from DEIAA, Jaipur To SEIAA, Rajasthan existing… — environmental approval granted, 1.6 km away
- Existing Masonary Mining Lease (M.L. No. – 796/97, Area: 0.50 Ha) — more information requested, 1.7 km away
- R.D. Stones — more information requested, 1.8 km away
- R.D. Stones — environmental approval granted, 1.8 km away
- Shri Chhagan Lal Meena (ML No. - 245/1993) — environmental approval granted, 1.9 km away
- Enhancement in production capacity from 50000 TPA to 200000 TPA of Khora Sarna… — more information requested, 2 km away
- Expansion of Group Housing Project "Air Force Naval Housing Project" — environmental approval granted, 3.1 km away
More from Giriraj Singh in Jaipur
- Expansion in Production capacity of Earlier Granted EC Proposed from 73000 TPA… — lapsed
- Expansion in Production capacity of Earlier Granted EC Proposed from 50,000… — lapsed
- Expansion in Production capacity of Earlier Granted EC Proposed from 73000 TPA… — lapsed
- "Reappraisal of EC from DEIAA to SEIAA" Existing Masonry stone Mining Project… — environmental approval granted
- "Reappraisal of EC from DEIAA to SEIAA" Existing Masonry stone Mining Project… — environmental approval granted
- "Reappraisal of EC from DEIAA to SEIAA" Existing Masonry stone Mining Project… — environmental approval granted
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.