What is this project?
Transfar EC of "Masonry Stone Mining Project, ML No.-14/2007" with Production Capacity- 60,000 TPA, Area:- 1.0 ha., Near Village- Kotri, Tehsil Kishangarh District– Ajmer (Rajasthan) by Applicant - PARSARAM CHOUDHARY is a lapsed mining project in Kotri, Roopangarh, Ajmer, Rajasthan. The site covers 2.5 acres.
Who is building it?
The applicant is Parsa Ram Choudhary.
Has it been approved?
No. The application was lapsed on 24 May 2025, so it is no longer under consideration.
Where is it?
In Kotri, Roopangarh, Ajmer, Rajasthan.
How big is it?
It has a stated cost of ₹40 lakh and a site of 2.5 acres.
When was it filed?
The application was filed on 19 Dec 2024.
Project details
| Status | Lapsed |
|---|---|
| Status since | 24 May 2025 |
| Application filed | 19 Dec 2024 |
| Approval sought | Environmental approval |
| Application type | Ownership transfer |
| Sector | Mining |
| Applicant | Parsa Ram Choudhary |
| Land area | 2.5 acres (1 ha) |
| Project cost | ₹40 lakh |
| Village / locality | Kotri |
| Taluk / tehsil | Roopangarh |
| District | Ajmer |
| State | Rajasthan |
| Location from | Site boundary on record |
| Our reference | WID-RJ-17279 |
In context
1,559 applications in Ajmer since January 2022 are in the same category (Mining): 904 approved, 102 filed or under review, and 553 withdrawn, lapsed or rejected. The approved ones took a median of 4 months from filing to approval. At 2.5 acres, this one is smaller than 96% of them.
3 other mining leases have applied within 500 m of this site; together with this one they cover 9.9 acres. Under India's environmental rules, mining leases less than 500 m apart are assessed together as one cluster, so the combined area can decide which clearance is needed. 4 mining leases have applied within 5 km.
Where it is
Kotri, Roopangarh, Ajmer, Rajasthan. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Transfar EC of "Masonry Stone Mining Project, ML No.-13/2007" with Production… — lapsed, 0 m away
- Re-Appraisal of EC granted from DEIAA, Jaipur (Raj.) of Existing QF Mining… — lapsed, 0 m away
- Re-Appraisal of EC granted from DEIAA, Jaipur (Raj.) of Existing QF Mining… — returned to applicant, 0 m away
- Re-Appraisal of EC granted from DEIAA, Jaipur (Raj.) of Existing QF Mining… — lapsed, 0 m away
- Re-Appraisal of EC granted from DEIAA, Jaipur (Raj.) of Existing QF Mining… — lapsed, 0 m away
- Re-Appraisal of EC granted from DEIAA, Jaipur (Raj.) of Existing QF Mining… — lapsed, 0 m away
- Parsa Ram Choudhary — environmental approval granted, 0 m away
- Re-Appraisal of "Masonry Stone Mining Project, ML No.-13/2007" with Production… — environmental approval granted, 0 m away
More from Parsa Ram Choudhary in Ajmer