Quick answers
What is this project?
Existing "Sandstone Mining Project has been transferring via Sugan Kanwar W/o. Prem Giri Transfer to Sh. Virendra Prajapati Q.L. No.- 2304 Keru", with Production Capacity- 1710 TPA, Area: - 0.18 ha by Sh. Virendra Prajapati is a lapsed mining project in Barli, Jodhpur, Rajasthan. The site covers 0.5 acres.
Who is building it?
The applicant is Virendra Prajapati.
Has it been approved?
No. The application was lapsed on 20 Feb 2026, so it is no longer under consideration.
Where is it?
In Barli, Jodhpur, Rajasthan.
How big is it?
It has a stated cost of ₹5 lakh and a site of 0.5 acres.
When was it filed?
The application was filed on 2 Dec 2024.
One of 2 filings for this project. The project's main page, with every filing and where each stands: Existing "Sandstone Mining Project has been transferring via Sugan Kanwar W/o. Prem Giri…
Project details
| Official title | Existing "Sandstone Mining Project has been transferring via Sugan Kanwar W/o. Prem Giri Transfer to Sh. Virendra Prajapati Q.L. No.- 2304 Keru", with Production Capacity- 1710 TPA, Area: - 0.18 ha., at Near village- Keru, Tehsil- and- District- Jodhpur (Rajasthan), by Sh. Virendra Prajapati |
|---|---|
| Status | Lapsed |
| Status since | 20 Feb 2026 |
| Application filed | 2 Dec 2024 |
| Approval sought | Environmental approval |
| Application type | Ownership transfer |
| Sector | Mining |
| Applicant | Virendra Prajapati |
| Land area | 1,900 m² |
| Project cost | ₹5 lakh |
| Village / locality | Barli |
| Taluk / tehsil | Jodhpur |
| District | Jodhpur |
| State | Rajasthan |
| Location from | Site boundary on record |
| Our reference | WID-RJ-17721 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| New project filed 16 Feb 2026 | Lapsed | 0.5 acres | ₹5 lakh |
| Ownership transfer filed 2 Dec 2024 (this page) | Lapsed | 0.5 acres | ₹5 lakh |
In context
11,954 applications in Jodhpur since January 2022 are in the same category (Mining): 4,406 approved, 210 filed or under review, and 7,338 withdrawn, lapsed or rejected. The approved ones took a median of 7 months from filing to approval. At 0.5 acres, this one is larger than 87% of them.
260 other mining leases have applied within 500 m of this site; together with this one they cover 121.4 acres. Under India's environmental rules, mining leases less than 500 m apart are assessed together as one cluster, so the combined area can decide which clearance is needed. 3,147 mining leases have applied within 5 km.
Where it is
Barli, Jodhpur, Rajasthan. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Existing "Sandstone Mining Project has been transferring via Sugan Kanwar W/o.… — lapsed, 0 m away
- Re-Appraisal of EC Granted from DEIAA Jodhpur to SEIAA Rajasthan Existing… — lapsed, 0 m away
- QL -73 Barli-B, Near village. Barli-B, Tehsil and District Jodhpur (Raj.) Sh.… — lapsed, 0 m away
- Re-Appraisal of EC Granted Rajasthan Existing "Sandstone(Minor Mineral) mining… — lapsed, 0 m away
- Re-appraisal of Environmental Clearance granted by DEIAA, Jodhpur(Raj.) of our… — environmental approval granted, 0 m away
- 32, Barli-B, Samandar Khan — lapsed, 0 m away
- Existing "Sandstone Mining Project has been transferring via Kana Ram to Babu… — lapsed, 0 m away
- Existing Sandstone Mining Project; (Non-Operational) Q.L. No.- 75, Area:… — lapsed, 0 m away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.