What is Developing? Open the mapMap

LapsedMining · Sikar, Rajasthan

"Re-Appraisal of EC granted from DEIAA, Sikar (Raj.) of Existing for Masonry Stone Mining Project" (Lease Area 1.00ha and M.L. No.- 569/2008) with production capacity 144000 TPA (ROM) located Near Village –Nimod, Tehsil – Neem Ka Thana, Dist. Sikar (Raj.) by M/S R.K. Crusher company as per MOEFCC OM Dated 28.04.2023

"Re-Appraisal of EC granted from DEIAA, Sikar (Raj.) of Existing for Masonry Stone Mining Project" (Lease Area 1.00ha and M.L. No.- 569/2008) with production capacity 144000 TPA (ROM) located Near Village –Nimod, Tehsil – Neem Ka Thana, Dist. Sikar (Raj.) by M/S R.K. Crusher company as per MOEFCC OM Dated 28.04.2023 is a lapsed mining project in Nimod, Neem-Ka-Thana, Sikar, Rajasthan. The site covers 2.5 acres. Its stated project cost is ₹50 lakh. As of 27 Nov 2026, its status is “Lapsed” (since 24 Aug 2025).

See it on the live map All projects in Sikar

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Quick answers

What is this project?

"Re-Appraisal of EC granted from DEIAA, Sikar (Raj.) of Existing for Masonry Stone Mining Project" (Lease Area 1.00ha and M.L. No.- 569/2008) with production capacity 144000 TPA (ROM) located Near Village –Nimod, Tehsil – Neem Ka Thana, Dist. Sikar (Raj.) by M/S R.K. Crusher company as per MOEFCC OM Dated 28.04.2023 is a lapsed mining project in Nimod, Neem-Ka-Thana, Sikar, Rajasthan. The site covers 2.5 acres.

Who is building it?

The applicant is Ranjana sharma.

Has it been approved?

No. The application was lapsed on 24 Aug 2025, so it is no longer under consideration.

Where is it?

In Nimod, Neem-Ka-Thana, Sikar, Rajasthan.

How big is it?

It has a stated cost of ₹50 lakh and a site of 2.5 acres.

When was it filed?

The application was filed on 4 Jul 2024.

Project details

StatusLapsed
Status since24 Aug 2025
Application filed4 Jul 2024
Approval soughtEnvironmental approval
Application typeNew project
SectorMining
ApplicantRanjana sharma
Land area2.5 acres (1 ha)
Project cost₹50 lakh
Village / localityNimod
Taluk / tehsilNeem-Ka-Thana
DistrictSikar
StateRajasthan
Location fromSite boundary on record
Our referenceWID-RJ-17774

In context

837 applications in Sikar since January 2022 are in the same category (Mining): 470 approved, 62 filed or under review, and 305 withdrawn, lapsed or rejected. The approved ones took a median of 3 months from filing to approval. At 2.5 acres, this one is smaller than 99% of them.

12 other mining leases have applied within 500 m of this site; together with this one they cover 35.3 acres. Under India's environmental rules, mining leases less than 500 m apart are assessed together as one cluster, so the combined area can decide which clearance is needed. 104 mining leases have applied within 5 km.

Where it is

Nimod, Neem-Ka-Thana, Sikar, Rajasthan. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

More from Ranjana sharma in Sikar

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.