Quick answers
What is this project?
Term Of Reference Environment Clearance Granite Mining Project (ML. No. 04/2024) is a proposed mining project in Baghera, Kekri, Ajmer, Rajasthan. The site covers 2.5 acres.
Who is building it?
The applicant is Shree Ganesh Stonex.
Has it been approved?
Yes. Its status is “Cleared for impact study” (since 24 Jun 2024), as of 27 Nov 2026.
Where is it?
In Baghera, Kekri, Ajmer, Rajasthan.
How big is it?
It has a stated cost of ₹2.5 crore and a site of 2.5 acres.
When was it filed?
The application was filed on 25 Apr 2024.
One of 2 filings for this project. The project's main page, with every filing and where each stands: Term Of Reference Environment Clearance Granite Mining Project (ML. No. 04/2024)
Project details
| Official title | Term Of Reference Environment Clearance Granite Mining Project (ML. No. 04/2024), at Village– Baghera, Tehsil – Kekri, District– Kekri (Raj.), State - Rajasthan. |
|---|---|
| Status | Cleared for impact study |
| Status since | 24 Jun 2024 |
| Application filed | 25 Apr 2024 |
| Approval sought | Environmental approval |
| Application type | Early planning |
| Sector | Mining |
| Applicant | Shree Ganesh Stonex |
| Land area | 2.5 acres (1 ha) |
| Project cost | ₹2.5 crore |
| Village / locality | Baghera |
| Taluk / tehsil | Kekri |
| District | Ajmer |
| State | Rajasthan |
| Location from | Site boundary on record |
| Our reference | WID-RJ-18293 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| New project filed 20 May 2025 | Environmental approval granted | 2.5 acres | ₹2.5 crore |
| Early planning filed 25 Apr 2024 (this page) | Cleared for impact study | 2.5 acres | ₹2.5 crore |
In context
1,559 applications in Ajmer since January 2022 are in the same category (Mining): 904 approved, 102 filed or under review, and 553 withdrawn, lapsed or rejected. The approved ones took a median of 4 months from filing to approval. At 2.5 acres, this one is smaller than 96% of them.
1 other mining lease has applied within 500 m of this site; together with this one they cover 10.7 acres. Under India's environmental rules, mining leases less than 500 m apart are assessed together as one cluster, so the combined area can decide which clearance is needed. 55 mining leases have applied within 5 km.
Where it is
Baghera, Kekri, Ajmer, Rajasthan. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Term Of Reference Environment Clearance Granite Mining Project (ML. No. 04/2024) — environmental approval granted, 0 m away
- Baghera Granite Mine, M.L. No. 07/2021, Khasra No.: 6564/128, Area – 3.3123… — environmental approval granted, 250 m away
- Proposed Granite & Masonry Stone Mining Project, M.L. No.- 38/2025. Reference… — environmental approval granted, 600 m away
- Proposed Granite & Masonry Stone Mining Project, M.L. No.- 38/2025. Reference… — cleared for impact study, 600 m away
- Baghera Granite Applied ML Area in Cluster (M.L. No.: 62/2022 — cleared for impact study, 700 m away
- Baghera Granite Applied ML Area in Cluster (M.L. No.: 62/2022 — environmental approval granted, 700 m away
- Expansion in EC of Baghera Granite Mine in Cluster (M.L. No.: 29/2019, Khasra… — environmental approval granted, 750 m away
- Expansion in EC of Baghera Granite Mine in Cluster (M.L. No.: 29/2019, Khasra… — cleared for impact study, 750 m away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.