One of 2 filings for this project. The project's main page, with every filing and where each stands: Proposed "Wire Enamels, Insulating Varnish, Impregnating Resin and Phenolic Resin…
Project details
| Status | Cleared for impact study |
|---|---|
| Status since | 13 Dec 2024 |
| Application filed | 10 Dec 2024 |
| Approval sought | Environmental approval |
| Application type | Early planning |
| Sector | Industry |
| Applicant | Bawa Polymers |
| Land area | 1.6 acres (0.6 ha) |
| Project cost | ₹14.6 crore |
| Village / locality | Keshwana Gujar |
| Taluk / tehsil | Kotputli |
| District | Jaipur |
| State | Rajasthan |
| Location from | Site boundary on record |
| Our reference | WID-RJ-18297 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| New project filed 31 May 2025 | Environmental approval granted | 1.6 acres | ₹14.6 crore |
| Early planning filed 10 Dec 2024 (this page) | Cleared for impact study | 1.6 acres | ₹14.6 crore |
In context
74 applications in Jaipur since January 2022 are in the same category (Industry): 45 approved, 16 filed or under review, and 13 withdrawn, lapsed or rejected. The approved ones took a median of 42 days from filing to approval. At 1.6 acres, this one is smaller than 72% of them.
9 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Keshwana Gujar, Kotputli, Jaipur, Rajasthan. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Proposed "Wire Enamels, Insulating Varnish, Impregnating Resin and Phenolic… — environmental approval granted, 0 m away
- Proposed project of Pesticide Technical manufacturing by M/s. Tephra… — returned to applicant, 100 m away
- Proposed project of Pesticide Technical manufacturing by M/s. Tephra… — returned to applicant, 100 m away
- Proposed project of Pesticide Technical manufacturing by M/s. Tephra… — cleared for impact study, 100 m away
- Change of Product mix in existing Pesticide Manufacturing Unit without… — initial checks, 200 m away
- Proposed Synthetic Organic Chemical Manufacturing Unit @ 3360 TPA (Acrylic… — returned to applicant, 600 m away
- Proposed Synthetic Organic Chemical Manufacturing Unit @ 3360 TPA (Acrylic… — cleared for impact study, 600 m away
- Building project by Industrial Shed of Emerge Glass India Private Limited — under environmental review, 1000 m away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.