One of 2 filings for this project. The project's main page, with every filing and where each stands: Proposed Dye Manufacturing & Formulation unit by M/s. Hind Chemical Industries
Project details
| Status | Cleared for impact study |
|---|---|
| Status since | 3 Sept 2024 |
| Application filed | 29 Aug 2024 |
| Approval sought | Environmental approval |
| Application type | Early planning |
| Sector | Industry |
| Applicant | Hind Chemical Industries |
| Land area | 4,000 m² |
| Project cost | ₹2 crore |
| Village / locality | Parvatsar |
| Taluk / tehsil | Parbatsar |
| District | Nagaur |
| State | Rajasthan |
| Location from | Site boundary on record |
| Our reference | WID-RJ-18420 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| New project filed 1 May 2025 | Environmental approval granted | 1 acre | ₹2 crore |
| Early planning filed 29 Aug 2024 (this page) | Cleared for impact study | 1 acre | ₹2 crore |
In context
17 applications in Nagaur since January 2022 are in the same category (Industry): 12 approved, 4 filed or under review, and 1 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 1 acre, this one is smaller than 88% of them.
20 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Parvatsar, Parbatsar, Nagaur, Rajasthan. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Proposed Dye Manufacturing & Formulation unit by M/s. Hind Chemical Industries — environmental approval granted, 0 m away
- Unsaturated Polyester Resin Plant — environmental approval granted, 300 m away
- Unsaturated Polyester Resin Plant — cleared for impact study, 300 m away
- Unsaturated Polyester Resin Plant — cleared for impact study, 350 m away
- Regularization & expansion of existing unit for manufacturing of TMT Bars… — cleared for impact study, 400 m away
- Proposed Resin Plant — environmental approval granted, 700 m away
- Proposed Resin Plant — cleared for impact study, 700 m away
- Epoxy Resin Plant" to the Tune of 900 Mt/Annum — lapsed, 700 m away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.