Cleared for impact studyMining · Pali, Rajasthan

Proposed Granite Mining Project, Ref. No.- 20231000092143, Area: 3.2451 Hectare. (Pvt. Land) at Khasra No.- 4849/4836, Near Village- Bhandar, Tehsil- Bali, District- Pali (Raj.) in favour of Shri Abhinav Sharma S/o Shri Nandlal Sharma

Proposed Granite Mining Project, Ref. No.- 20231000092143, Area: 3.2451 Hectare. (Pvt. Land) at Khasra No.- 4849/4836, Near Village- Bhandar, Tehsil- Bali, District- Pali (Raj.) in favour of Shri Abhinav Sharma S/o Shri Nandlal Sharma is a proposed mining project in Bhondar, Bali, Pali, Rajasthan. The site covers 8 acres. Its stated project cost is ₹4.2 crore. As of 27 Nov 2026, its status is “Cleared for impact study” (since 16 Sept 2024).

See it on the live map All projects in Pali

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Quick answers

What is this project?

Proposed Granite Mining Project, Ref. No.- 20231000092143, Area: 3.2451 Hectare. (Pvt. Land) at Khasra No.- 4849/4836, Near Village- Bhandar, Tehsil- Bali, District- Pali (Raj.) in favour of Shri Abhinav Sharma S/o Shri Nandlal Sharma is a proposed mining project in Bhondar, Bali, Pali, Rajasthan. The site covers 8 acres.

Who is building it?

The applicant is Abhinav Sharma.

Has it been approved?

Yes. Its status is “Cleared for impact study” (since 16 Sept 2024), as of 27 Nov 2026.

Where is it?

In Bhondar, Bali, Pali, Rajasthan.

How big is it?

It has a stated cost of ₹4.2 crore and a site of 8 acres.

When was it filed?

The application was filed on 13 Aug 2024.

Project details

StatusCleared for impact study
Status since16 Sept 2024
Application filed13 Aug 2024
Approval soughtEnvironmental approval
Application typeEarly planning
SectorMining
ApplicantAbhinav Sharma
Land area8 acres (3.3 ha)
Project cost₹4.2 crore
Village / localityBhondar
Taluk / tehsilBali
DistrictPali
StateRajasthan
Location fromSite boundary on record
Our referenceWID-RJ-18530

All filings for this project

This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):

FilingStatusLandCost
New project filed 4 Jun 2025Lapsed8 acres₹4.2 crore
Early planning filed 13 Aug 2024 (this page)Cleared for impact study8 acres₹4.2 crore

In context

1,118 applications in Pali since January 2022 are in the same category (Mining): 623 approved, 93 filed or under review, and 402 withdrawn, lapsed or rejected. The approved ones took a median of 4 months from filing to approval. At 8 acres, this one is larger than 71% of them.

3 other mining leases have applied within 500 m of this site; together with this one they cover 21.6 acres. Under India's environmental rules, mining leases less than 500 m apart are assessed together as one cluster, so the combined area can decide which clearance is needed. 4 mining leases have applied within 5 km.

Where it is

Bhondar, Bali, Pali, Rajasthan. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.