What is this project?
Expansion of Hydrazine Hydrate & Azodicarbonamide manufacturing unit is an approved industrial project in Chak 1 S T G, Hanumangarh, Rajasthan. The site covers 2 acres.
Who is building it?
The applicant is S S Blow Chem PVT LTD.
Has it been approved?
Yes. Its status is “Environmental approval granted” (since 23 Jul 2024), as of 27 Nov 2026.
Where is it?
In Chak 1 S T G, Hanumangarh, Rajasthan.
How big is it?
It has a stated cost of ₹16.7 crore and a site of 2 acres.
When was it filed?
The application was filed on 24 Feb 2024.
Project details
| Status | Environmental approval granted |
|---|---|
| Status since | 23 Jul 2024 |
| Application filed | 24 Feb 2024 |
| Approval sought | Environmental approval |
| Application type | Expansion |
| Sector | Industry |
| Applicant | S S Blow Chem PVT LTD |
| Land area | 2 acres (0.8 ha) |
| Project cost | ₹16.7 crore |
| Village / locality | Chak 1 S T G |
| Taluk / tehsil | Hanumangarh |
| District | Hanumangarh |
| State | Rajasthan |
| Location from | Site boundary on record |
| Our reference | WID-RJ-19037 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| Expansion filed 24 Feb 2024 (this page) | Environmental approval granted | 2 acres | ₹16.7 crore |
| Early planning filed 2 Mar 2023 | Cleared for impact study | 2 acres | ₹16.7 crore |
In context
13 applications in Hanumangarh since January 2022 are in the same category (Industry): 12 approved, 0 filed or under review, and 1 withdrawn, lapsed or rejected. The approved ones took a median of 3 months from filing to approval. At 2 acres, this one is smaller than 69% of them.
8 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Chak 1 S T G, Hanumangarh, Rajasthan. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Expansion of Hydrazine Hydrate & Azodicarbonamide manufacturing unit by S S… — environmental approval granted, 0 m away
- Expansion of Hydrazine Hydrate & Azodicarbonamide manufacturing unit — cleared for impact study, 0 m away
- Expansion of existing unit from 360 TPA to 720 TPA for manufacturing of… — lapsed, 200 m away
- Expansion of existing unit from 360 TPA to 720 TPA for manufacturing of… — cleared for impact study, 200 m away
- Industrial project by KSRK Chemicals Pvt. Ltd. — environmental approval granted, 200 m away
- Industrial project by KSRK Chemicals Pvt. Ltd. — environmental approval granted, 200 m away
- Proposed Expansion of Chemical Manufacturing Unit of Hydrazine Hydrate from… — environmental approval granted, 400 m away
- Proposed Expansion of Chemical Manufacturing Unit of Hydrazine Hydrate from… — cleared for impact study, 400 m away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.