Quick answers
What is this project?
"Reappraisal of the EC granted by DEIAA Ajmer for Marble Mining Project, M.L. No: 110/2007" is an approved mining project in Ghatiali, Sawar, Ajmer, Rajasthan. The site covers 7.3 acres.
Who is building it?
The applicant is Aditya Sharma.
Has it been approved?
Yes. Its status is “Environmental approval granted” (since 12 Aug 2026), as of 27 Nov 2026.
Where is it?
In Ghatiali, Sawar, Ajmer, Rajasthan.
How big is it?
It has a stated cost of ₹50 lakh and a site of 7.3 acres.
When was it filed?
The application was filed on 31 Dec 2024.
Project details
| Status | Environmental approval granted |
|---|---|
| Status since | 12 Aug 2026 |
| Application filed | 31 Dec 2024 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Mining |
| Applicant | Aditya Sharma |
| Land area | 7.3 acres (3 ha) |
| Project cost | ₹50 lakh |
| Village / locality | Ghatiali |
| Taluk / tehsil | Sawar |
| District | Ajmer |
| State | Rajasthan |
| Location from | Site boundary on record |
| Our reference | WID-RJ-20041 |
In context
1,559 applications in Ajmer since January 2022 are in the same category (Mining): 904 approved, 102 filed or under review, and 553 withdrawn, lapsed or rejected. The approved ones took a median of 4 months from filing to approval. At 7.3 acres, this one is larger than 57% of them.
2 other mining leases have applied within 500 m of this site; together with this one they cover 61.4 acres. Under India's environmental rules, mining leases less than 500 m apart are assessed together as one cluster, so the combined area can decide which clearance is needed. 63 mining leases have applied within 5 km.
Where it is
Ghatiali, Sawar, Ajmer, Rajasthan. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- "Marble Mining project (M.L.No.110/2007)" — lapsed, 0 m away
- Shri Dev Lal Gurjar Mineral -Marble Ml.No 24/2000 — lapsed, 300 m away
- Shri Ashok Chandna, Marble mine, ML No.77/2008 — lapsed, 300 m away
- Re-Appraisal of Ec Granted From Deiaa Ajmer to Seiaa Rajasthan Existing… — environmental approval granted, 500 m away
- M/s Shiv Balaji Marble , M.L. no. -23/2000 , Marble Mining Project — lapsed, 600 m away
- Re-Appraisal of EC Granted from DEIAA AJMER to SEIAA Rajasthan existing… — environmental approval granted, 650 m away
- Reappraisal of EC from DEIAA to SEIAA for Masonry Stone Mining Project, ML… — environmental approval granted, 650 m away
- Reappraisal of DEIAA EC to SEIAA for Masonry Stone Mining Project, ML… — environmental approval granted, 650 m away
More from Aditya Sharma in Ajmer
- Industrial area Kanai Kalan — cleared for impact study
- Expansion of existing Industrial Area Kalesara from 48.3 ha to 143.57 ha — returned to applicant
- "Marble Mining project (M.L.No.110/2007)" — lapsed
- Industrial Area -Bewanja Extension — lapsed
- Industrial Area -Kalesara Phase-Ii — lapsed
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.