What is this project?
Expansion in Production Existing Masonry Stone Mining Lease (ML No. – 51/04, Area: 1.00 Ha) is a lapsed mining project in Tiloniya, Kishangarh, Ajmer, Rajasthan. The site covers 2.5 acres.
Who is building it?
The applicant is Ajay Stone Crusher.
Has it been approved?
No. The application was lapsed on 6 Sept 2026, so it is no longer under consideration.
Where is it?
In Tiloniya, Kishangarh, Ajmer, Rajasthan.
How big is it?
It has a stated cost of ₹1 crore and a site of 2.5 acres.
When was it filed?
The application was filed on 28 Apr 2025.
Project details
| Official title | Expansion in Production Existing Masonry Stone Mining Lease (ML No. – 51/04, Area: 1.00 Ha) at Near village-Churli , Tehsil- Kishangarh & District- Ajmer (Rajasthan) of M/s Ajay Stone Crusher |
|---|---|
| Status | Lapsed |
| Status since | 6 Sept 2026 |
| Application filed | 28 Apr 2025 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Mining |
| Applicant | Ajay Stone Crusher |
| Land area | 2.5 acres (1 ha) |
| Project cost | ₹1 crore |
| Village / locality | Tiloniya |
| Taluk / tehsil | Kishangarh |
| District | Ajmer |
| State | Rajasthan |
| Location from | Site boundary on record |
| Our reference | WID-RJ-20403 |
In context
1,559 applications in Ajmer since January 2022 are in the same category (Mining): 904 approved, 102 filed or under review, and 553 withdrawn, lapsed or rejected. The approved ones took a median of 4 months from filing to approval. At 2.5 acres, this one is smaller than 96% of them.
23 other mining leases have applied within 500 m of this site; together with this one they cover 110 acres. Under India's environmental rules, mining leases less than 500 m apart are assessed together as one cluster, so the combined area can decide which clearance is needed. 26 mining leases have applied within 5 km.
Where it is
Tiloniya, Kishangarh, Ajmer, Rajasthan. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Existing Masonry Stone Mining Lease (ML No. – 51/04, Area: 1.00 Ha) — lapsed, 0 m away
- EC Re-appraisal of Existing Masonry Stone Mining Lease (ML No. – 51/04, Area:… — environmental approval granted, 0 m away
- EC Re-appraisal of Existing Masonry Stone Mining lease, M.L No. 51/2004, Area… — lapsed, 0 m away
- EC Re Appraisal of Existing Masonry Stone Mining Lease (ML NO. 211/2008,… — lapsed, 0 m away
- Existing Masonry Stone Mining Lease (ML No. – 52/04, Area: 1.00 Ha) — lapsed, 100 m away
- Expansion in Production Existing Masonry Stone Mining Lease (ML No. – 52/04,… — lapsed, 100 m away
- EC Re-appraisal of Existing Masonry Stone Mining Lease (ML No. – 52/04, Area:… — environmental approval granted, 100 m away
- "Expansion in Production Capacity of Earlier Granted EC from 48,870 TPA (ROM)… — initial checks, 100 m away
More from Ajay Stone Crusher in Ajmer
- "Expansion in Production Capacity of Earlier Granted EC from 50,220 TPA (ROM)… — initial checks
- "Expansion in Production Capacity of Earlier Granted EC from 9,450 TPA (ROM)… — initial checks
- "Expansion in Production Capacity of Earlier Granted EC from 48,870 TPA (ROM)… — initial checks
- Existing Masonry Stone Mining Lease (ML No. – 211/2008 Area: 1.00 Ha) — lapsed
- Existing Masonry Stone Mining Lease (ML No. – 53/04, Area: 1.00 Ha) — lapsed
- Existing Masonry Stone Mining Lease (ML No. – 51/04, Area: 1.00 Ha) — lapsed