Quick answers
What is this project?
Existing Masonry Stone Mining Project, M.L. no. 441/2002, Area- 1.0 ha. (Govt. Land) Near Village- Bijashna, Tehsil- Pahari, Dist.- Deeg (Raj.) of applicant M/S A R HELICAL GREEN ENERGY, Proprietor Dr. Ram Swaroop Potaliya is an approved mining project in Bijasana, Pahari, Bharatpur, Rajasthan. The site covers 2.5 acres.
Who is building it?
The applicant is Ar Helicalgreen Energy.
Has it been approved?
Yes. Its status is “Environmental approval granted” (since 12 Feb 2026), as of 27 Nov 2026.
Where is it?
In Bijasana, Pahari, Bharatpur, Rajasthan.
How big is it?
It has a stated cost of ₹1 crore and a site of 2.5 acres.
When was it filed?
The application was filed on 18 Jul 2025.
Project details
| Status | Environmental approval granted |
|---|---|
| Status since | 12 Feb 2026 |
| Application filed | 18 Jul 2025 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Mining |
| Applicant | Ar Helicalgreen Energy |
| Land area | 2.5 acres (1 ha) |
| Project cost | ₹1 crore |
| Village / locality | Bijasana |
| Taluk / tehsil | Pahari |
| District | Bharatpur |
| State | Rajasthan |
| Location from | Site boundary on record |
| Our reference | WID-RJ-20410 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| New project filed 18 Jul 2025 (this page) | Environmental approval granted | 2.5 acres | ₹1 crore |
| New project filed 4 Jun 2025 | Not approved | 2.5 acres | ₹1 crore |
In context
945 applications in Bharatpur since January 2022 are in the same category (Mining): 401 approved, 81 filed or under review, and 463 withdrawn, lapsed or rejected. The approved ones took a median of 4 months from filing to approval. At 2.5 acres, this one is smaller than 94% of them.
31 other mining leases have applied within 500 m of this site; together with this one they cover 77.8 acres. Under India's environmental rules, mining leases less than 500 m apart are assessed together as one cluster, so the combined area can decide which clearance is needed. 290 mining leases have applied within 5 km.
Where it is
Bijasana, Pahari, Bharatpur, Rajasthan. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Existing Masonry Stone Mining Project, M.L. no. 441/2002, Area- 1.0 ha. (Govt.… — not approved, 0 m away
- Akhtar Khan — lapsed, 100 m away
- Re-Appraisal of EC Granted from DEIAA Bharatpur To SEIAA Rajasthan of existing… — environmental approval granted, 100 m away
- Reappraisal of Earlier Granted EC By DEIAA, Bharatpur, (Raj.) Vide Letter… — lapsed, 150 m away
- Re-Appraisal of EC Granted from DEIAA Bharatpur To SEIAA Rajasthan of existing… — environmental approval granted, 200 m away
- "Re-Appraisal of EC Granted from DEIAA Bharatpur To SEIAA Rajasthan of… — lapsed, 200 m away
- "Transfer of Earlier EC Granted from Sh. Sattar to M/s Samar Infra Pvt. Ltd.,… — lapsed, 200 m away
- "Transfer of Earlier EC Granted from Sh. Surendra Kumar Jain to M/s Samar… — lapsed, 200 m away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.