What is Developing? Open the mapMap

LapsedMining · Pali, Rajasthan

Re Appraisal of EC Granted from DEIAA, Pali For Existing Masonry Stone mining Project M.L. No. 233/1997 Area of -1.0 Ha, Located Near village-Panchalwara & Dantiwada, Tehsil- Bali, & District-Pali (Raj.), in favour of Jitendra Singh Khinchi

Re Appraisal of EC Granted from DEIAA, Pali For Existing Masonry Stone mining Project M.L. No. 233/1997 Area of -1.0 Ha, Located Near village-Panchalwara & Dantiwada, Tehsil- Bali, & District-Pali (Raj.), in favour of Jitendra Singh Khinchi is a lapsed mining project in Dantiwara, Bali, Pali, Rajasthan. The site covers 2.5 acres. Its stated project cost is ₹18 lakh. As of 27 Nov 2026, its status is “Lapsed” (since 24 Jun 2024).

See it on the live map All projects in Pali

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Quick answers

What is this project?

Re Appraisal of EC Granted from DEIAA, Pali For Existing Masonry Stone mining Project M.L. No. 233/1997 Area of -1.0 Ha, Located Near village-Panchalwara & Dantiwada, Tehsil- Bali, & District-Pali (Raj.), in favour of Jitendra Singh Khinchi is a lapsed mining project in Dantiwara, Bali, Pali, Rajasthan. The site covers 2.5 acres.

Who is building it?

The applicant is Jitendra Singh Khichi.

Has it been approved?

No. The application was lapsed on 24 Jun 2024, so it is no longer under consideration.

Where is it?

In Dantiwara, Bali, Pali, Rajasthan.

How big is it?

It has a stated cost of ₹18 lakh and a site of 2.5 acres.

When was it filed?

The application was filed on 24 Jun 2024.

Project details

StatusLapsed
Status since24 Jun 2024
Application filed24 Jun 2024
Approval soughtEnvironmental approval
Application typeNew project
SectorMining
ApplicantJitendra Singh Khichi
Land area2.5 acres (1 ha)
Project cost₹18 lakh
Village / localityDantiwara
Taluk / tehsilBali
DistrictPali
StateRajasthan
Location fromSite boundary on record
Our referenceWID-RJ-20447

In context

1,118 applications in Pali since January 2022 are in the same category (Mining): 623 approved, 93 filed or under review, and 402 withdrawn, lapsed or rejected. The approved ones took a median of 4 months from filing to approval. At 2.5 acres, this one is smaller than 91% of them.

No other mining lease on record is within 500 m of this site; 22 have applied within 5 km.

Where it is

Dantiwara, Bali, Pali, Rajasthan. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.