Quick answers
What is this project?
Reappraisal of the EC granted by DEIAA Ajmer for Masonry Stone Mining Project, M.L. No: 12/2011 is a lapsed mining project in Sheeli Beri, Beawar, Ajmer, Rajasthan. The site covers 2.5 acres.
Who is building it?
The applicant is Mahadev Crusher and Construction Company.
Has it been approved?
No. The application was lapsed on 23 Jul 2025, so it is no longer under consideration.
Where is it?
In Sheeli Beri, Beawar, Ajmer, Rajasthan.
How big is it?
It has a stated cost of ₹25 lakh and a site of 2.5 acres.
When was it filed?
The application was filed on 20 Jun 2025.
Project details
| Status | Lapsed |
|---|---|
| Status since | 23 Jul 2025 |
| Application filed | 20 Jun 2025 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Mining |
| Applicant | Mahadev Crusher and Construction Company |
| Land area | 2.5 acres (1 ha) |
| Project cost | ₹25 lakh |
| Village / locality | Sheeli Beri |
| Taluk / tehsil | Beawar |
| District | Ajmer |
| State | Rajasthan |
| Location from | Site boundary on record |
| Our reference | WID-RJ-21115 |
In context
1,559 applications in Ajmer since January 2022 are in the same category (Mining): 904 approved, 102 filed or under review, and 553 withdrawn, lapsed or rejected. The approved ones took a median of 4 months from filing to approval. At 2.5 acres, this one is smaller than 96% of them.
5 other mining leases have applied within 500 m of this site; together with this one they cover 14.8 acres. Under India's environmental rules, mining leases less than 500 m apart are assessed together as one cluster, so the combined area can decide which clearance is needed. 8 mining leases have applied within 5 km.
Where it is
Sheeli Beri, Beawar, Ajmer, Rajasthan. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Reappraisal of the EC granted by DEIAA Ajmer for Masonry Stone Mining Project,… — lapsed, 100 m away
- Re-Appraisal of EC Granted from DEIAA, Ajmer for Existing "Seliberi" Masonary… — environmental approval granted, 200 m away
- Re-appraisal of Environmental Clearance granted by DEIAA, Ajmer of our… — lapsed, 200 m away
- Re-appraisal of Environmental Clearance granted by DEIAA, Ajmer of our… — lapsed, 200 m away
- Re-appraisal of Environmental Clearance granted by DEIAA, Ajmer of our… — lapsed, 300 m away
- Re-appraisal of earlier granted EC by DEIAA Ajmer (Raj.) vide latter no.… — environmental approval granted, 750 m away
- Re-appraisal of earlier granted EC by DEIAA Ajmer (Raj.) vide latter no.… — environmental approval granted, 850 m away
- Transfer of EC granted by SEIAA Rajasthan vide latter no.… — lapsed, 1.7 km away
More from Mahadev Crusher and Construction Company in Ajmer
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.