Quick answers
What is this project?
Existing Quartz & Feldspar Mining Project, Expansion In Production Capacity 34000 TPA To 402479 TPA (ROM) (M.L No.–296/2006, Area – 4.00 ha., ) is a lapsed mining project in Naya Kheda, Beawar, Ajmer, Rajasthan. The site covers 9.9 acres.
Who is building it?
The applicant is Om Prakash Bhansali.
Has it been approved?
No. The application was lapsed on 9 Feb 2026, so it is no longer under consideration.
Where is it?
In Naya Kheda, Beawar, Ajmer, Rajasthan.
How big is it?
It has a stated cost of ₹2 crore and a site of 9.9 acres.
When was it filed?
The application was filed on 21 Jan 2025.
Project details
| Official title | Existing Quartz & Feldspar Mining Project, Expansion In Production Capacity 34000 TPA To 402479 TPA (ROM) (M.L No.–296/2006, Area – 4.00 ha., ) Located at Near village – Nayagaon, Teh. & District – Beawar (Raj.) in favor of Smt. Dharmistha Bhansali W/o Shri Om Prakash Bhansali. |
|---|---|
| Status | Lapsed |
| Status since | 9 Feb 2026 |
| Application filed | 21 Jan 2025 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Mining |
| Applicant | Om Prakash Bhansali |
| Land area | 9.9 acres (4 ha) |
| Project cost | ₹2 crore |
| Village / locality | Naya Kheda |
| Taluk / tehsil | Beawar |
| District | Ajmer |
| State | Rajasthan |
| Location from | Site boundary on record |
| Our reference | WID-RJ-21377 |
In context
1,559 applications in Ajmer since January 2022 are in the same category (Mining): 904 approved, 102 filed or under review, and 553 withdrawn, lapsed or rejected. The approved ones took a median of 4 months from filing to approval. At 9.9 acres, this one is larger than 60% of them.
No other mining lease on record is within 500 m of this site; 5 have applied within 5 km.
Where it is
Naya Kheda, Beawar, Ajmer, Rajasthan. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Existing Quartz & Feldspar (Major Minral) Mining Project, Expansion In… — cleared for impact study, 0 m away
- Reappraisal of the EC granted by DEIAA Ajmer for Quartz & Feldspar Mining… — lapsed, 650 m away
- Re-appraisal of earlier granted EC by DEIAA Ajmer (Raj.)vide latter no.… — environmental approval granted, 1.8 km away
- Re-appraisal of earlier granted EC by DEIAA Ajmer (Raj.)vide latter no.… — lapsed, 1.8 km away
- Re-appraisal of Environmental Clearance granted by DEIAA, Ajmer of our… — lapsed, 3.6 km away
- Reappraisal of the EC granted by DEIAA Ajmer for Quartz and Feldspar Mining… — lapsed, 3.8 km away
- Re-appraisal of Environmental Clearance granted by DEIAA, Ajmer of our… — lapsed, 4.7 km away
- Re-appraisal of Environmental Clearance granted by DEIAA, Ajmer of our… — lapsed, 5.5 km away
More from Om Prakash Bhansali in Ajmer
- Existing Quartz & Feldspar Mining Project, Expansion In Production Capacity… — cleared for impact study
- Existing Quartz & Feldspar (Major Minral) Mining Project, Expansion In… — cleared for impact study
- Existing Quartz & Feldspar Mining Project, Expansion In Production Capacity… — lapsed
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.