Quick answers
What is this project?
Transfer Lease Form-7existing Masonary Stone Mining Project M.L.No. 10/1993 Area 1.00 Hect. N/V Sanpha Tehsil Sindhari District Barmer (Raj.) in Favour of Kadno Devi(Lease Was Transfer From Keshra Ram to Kadno Devi) is a lapsed mining project in Trishuliya, Sindhari, Barmer, Rajasthan. The site covers 2.5 acres.
Who is building it?
The applicant is Kudano Devi.
Has it been approved?
No. The application was lapsed on 12 Sept 2025, so it is no longer under consideration.
Where is it?
In Trishuliya, Sindhari, Barmer, Rajasthan.
How big is it?
It has a stated cost of ₹10 lakh and a site of 2.5 acres.
When was it filed?
The application was filed on 30 Mar 2025.
Project details
| Status | Lapsed |
|---|---|
| Status since | 12 Sept 2025 |
| Application filed | 30 Mar 2025 |
| Approval sought | Environmental approval |
| Application type | Ownership transfer |
| Sector | Mining |
| Applicant | Kudano Devi |
| Land area | 2.5 acres (1 ha) |
| Project cost | ₹10 lakh |
| Village / locality | Trishuliya |
| Taluk / tehsil | Sindhari |
| District | Barmer |
| State | Rajasthan |
| Location from | Site boundary on record |
| Our reference | WID-RJ-21419 |
In context
878 applications in Barmer since January 2022 are in the same category (Mining): 465 approved, 100 filed or under review, and 313 withdrawn, lapsed or rejected. The approved ones took a median of 6 months from filing to approval. At 2.5 acres, this one is smaller than 97% of them.
4 other mining leases have applied within 500 m of this site; together with this one they cover 12.4 acres. Under India's environmental rules, mining leases less than 500 m apart are assessed together as one cluster, so the combined area can decide which clearance is needed. 37 mining leases have applied within 5 km.
Where it is
Trishuliya, Sindhari, Barmer, Rajasthan. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Re-Appraisal of Environmental Clearance Granted by Deiaa Barmer (Rajasthan) of… — environmental approval granted, 0 m away
- Re-Appraisal of Environmental Clearance Granted by Deiaa Barmer (Rajasthan) of… — environmental approval granted, 100 m away
- Re-Appraisal of Environmental Clearance Granted by Deiaa Barmer (Rajasthan) of… — environmental approval granted, 350 m away
- Re-Appraisal of Environmental Clearance Granted by Deiaa Barmer(Rajasthan) of… — environmental approval granted, 450 m away
- Reappraisal of EC granted by DEIAA Barmer of Our Existing Masonry Stone Mining… — environmental approval granted, 500 m away
- Re-Appraisal of Environmental Clearance Granted by Deiaa Barmer (Rajasthan) of… — lapsed, 550 m away
- Existing (Non-Operational) Masonry Stone Mining Project, ML No. -92/2005, Area… — lapsed, 550 m away
- Re -appraisal of Existing Masonry Stone Mine Project EC Granted DEIAA Barmer… — environmental approval granted, 550 m away
More from Kudano Devi in Barmer
- Re-Appraisal of Environmental Clearance Granted by Deiaa Barmer (Rajasthan) of… — environmental approval granted
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.