Quick answers
What is this project?
Enhancement in Production Capacity from 1,049 TPA (ROM) to 1,55,055.20 TPA (ROM) in Existing Garnet (Abrasive) Mining Project , M.L. No.- 44/2001, Area: 5.00 Hectare located at Khasra No.- 3680/39, Village & Tehsil- Sarwar, District- Kekri (erstwhile district- Ajmer) (Rajasthan) is a lapsed mining project in Sarwar, Ajmer, Rajasthan. The site covers 12.4 acres.
Who is building it?
The applicant is Narbada Stone Private Limited.
Has it been approved?
No. The application was lapsed on 22 Jul 2026, so it is no longer under consideration.
Where is it?
In Sarwar, Ajmer, Rajasthan.
How big is it?
It has a stated cost of ₹2.1 crore and a site of 12.4 acres.
When was it filed?
The application was filed on 11 Sept 2025.
One of 3 filings for this project. The project's main page, with every filing and where each stands: Enhancement in Production Capacity from 1,049 TPA (ROM) to 1,55,055.20 TPA (ROM) in…
Project details
| Status | Lapsed |
|---|---|
| Status since | 22 Jul 2026 |
| Application filed | 11 Sept 2025 |
| Approval sought | Environmental approval |
| Application type | Expansion |
| Sector | Mining |
| Applicant | Narbada Stone Private Limited |
| Land area | 12.4 acres (5 ha) |
| Project cost | ₹2.1 crore |
| Village / locality | Sarwar |
| Taluk / tehsil | Sarwar |
| District | Ajmer |
| State | Rajasthan |
| Location from | Site boundary on record |
| Our reference | WID-RJ-21956 |
All filings for this project
This project has 3 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| Expansion filed 11 Sept 2025 (this page) | Lapsed | 12.4 acres | ₹2.1 crore |
| Early planning filed 10 Mar 2025 | Cleared for impact study | 12.4 acres | ₹2.1 crore |
| Early planning filed 7 Nov 2024 | Withdrawn | 12.4 acres | ₹2.1 crore |
In context
1,559 applications in Ajmer since January 2022 are in the same category (Mining): 904 approved, 102 filed or under review, and 553 withdrawn, lapsed or rejected. The approved ones took a median of 4 months from filing to approval. At 12.4 acres, this one is larger than 91% of them.
2 other mining leases have applied within 500 m of this site; together with this one they cover 37.1 acres. Under India's environmental rules, mining leases less than 500 m apart are assessed together as one cluster, so the combined area can decide which clearance is needed. 7 mining leases have applied within 5 km.
Where it is
Sarwar, Ajmer, Rajasthan. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Enhancement in Production Capacity from 1,049 TPA (ROM) to 1,55,055.20 TPA… — cleared for impact study, 0 m away
- Transfer of Environmental Clearance for "Garnet Mining Project (M.L.… — environmental approval granted, 0 m away
- Enhancement in Production Capacity from 1,049 TPA (ROM) to 1,55,055.20 TPA… — withdrawn, 0 m away
- Terms of Reference (TOR) for "Expansion in Production Capacity from 1,325 TPA… — cleared for impact study, 300 m away
- Approval of Final EIA/EMP report for "Expansion in Production Capacity from… — environmental approval granted, 300 m away
- Garnet Mining project, M.L. No.-63/2003, ML Area:4.9954 Ha., — environmental approval granted, 500 m away
- Garnet Mining project, M.L. No.-63/2003, ML Area:4.9954 Ha., — cleared for impact study, 500 m away
- Virendra Ajmera, Quartz & Feldspar , ML NO-149/2008 — lapsed, 3.7 km away
More from Narbada Stone Private Limited in Ajmer
- Transfer of Environmental Clearance for "Garnet Mining Project (M.L.… — environmental approval granted
All 4 Narbada Stone projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.