Project details
| Status | Lapsed |
|---|---|
| Status since | 28 Dec 2025 |
| Application filed | 20 Nov 2025 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Mining |
| Applicant | Shaktipriya Minerals And Resources Private Limited |
| Land area | 7.5 acres (3 ha) |
| Project cost | ₹95 lakh |
| Village / locality | Sisodiya Guda |
| Taluk / tehsil | Vallabhnagar |
| District | Udaipur |
| State | Rajasthan |
| Location from | Site boundary on record |
| Our reference | WID-RJ-22448 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| New project filed 20 Nov 2025 (this page) | Lapsed | 7.5 acres | ₹95 lakh |
| Early planning filed 19 Sept 2025 | Lapsed | 7.5 acres | ₹1.2 crore |
In context
887 applications in Udaipur since January 2022 are in the same category (Mining): 493 approved, 45 filed or under review, and 349 withdrawn, lapsed or rejected. The approved ones took a median of 5 months from filing to approval. At 7.5 acres, this one is larger than 65% of them.
No other mining lease on record is within 500 m of this site; 5 have applied within 5 km.
Where it is
Sisodiya Guda, Vallabhnagar, Udaipur, Rajasthan. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Proposed Quartz & Feldspar Mining Project, Area- 3.0215 Ha., M.L. No.-… — lapsed, 0 m away
- Re-Appraisal of EC Granted from DEIAA Udaipur To SEIAA "Quartz (Minor Mineral)… — environmental approval granted, 1.3 km away
- "Estimate for Re-Construction and Widening of the Road from Bhinder to Panunda… — lapsed, 1.9 km away
- Mobile Tower installation by BSNL — lapsed, 3 km away
- Proposed Quartz, Feldspar & Masonry Stone Mining Project, Delineated Plot No.… — cleared for impact study, 3.9 km away
- BSNL Rajasthan-District Udaipur-Village-Chack Pemlakui-(106937) — forest land use approved, 4 km away
- Proposed Quartz, Feldspar & Masonry Stone Cluster Mining Project, Cluster No.… — cleared for impact study, 4.1 km away
- Proposed Quartz, Feldspar & Masonry Stone Mining Project, Delineated Plot… — cleared for impact study, 4.1 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.