Quick answers
What is this project?
Transfer of Earlier Granted EC from Sh. Devraj S/o Sh. Jindaram Panjabi to M/s Kumar Infrastructure Development Privet Limited" of Masonry Stone (Minor Mineral)" mining project M.L. No. 377/2006, with production capacity 1,02,771 TPA, over an area of 1.00 Hectare Located Near village –Nangal, Tehsil-Pahari, District- Deeg (Rajasthan) by Applicant M/s Kumar Infrastructure Development Privet Limited is a lapsed mining project in Dholet, Pahari, Bharatpur, Rajasthan. The site covers 2.5 acres.
Who is building it?
The applicant is Kumar Infrastructure Development Private Limited.
Has it been approved?
No. The application was lapsed on 20 Jul 2025, so it is no longer under consideration.
Where is it?
In Dholet, Pahari, Bharatpur, Rajasthan.
How big is it?
It has a stated cost of ₹40 lakh and a site of 2.5 acres.
When was it filed?
The application was filed on 7 Jan 2025.
Project details
| Status | Lapsed |
|---|---|
| Status since | 20 Jul 2025 |
| Application filed | 7 Jan 2025 |
| Approval sought | Environmental approval |
| Application type | Ownership transfer |
| Sector | Mining |
| Applicant | Kumar Infrastructure Development Private Limited |
| Land area | 2.5 acres (1 ha) |
| Project cost | ₹40 lakh |
| Village / locality | Dholet |
| Taluk / tehsil | Pahari |
| District | Bharatpur |
| State | Rajasthan |
| Location from | Site boundary on record |
| Our reference | WID-RJ-23066 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| Ownership transfer filed 7 Jan 2025 (this page) | Lapsed | 2.5 acres | ₹40 lakh |
| New project filed 7 Jan 2025 | Lapsed | 2.5 acres | ₹40 lakh |
In context
945 applications in Bharatpur since January 2022 are in the same category (Mining): 401 approved, 81 filed or under review, and 463 withdrawn, lapsed or rejected. The approved ones took a median of 4 months from filing to approval. At 2.5 acres, this one is smaller than 94% of them.
No other mining lease on record is within 500 m of this site; 90 have applied within 5 km.
Where it is
Dholet, Pahari, Bharatpur, Rajasthan. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Re-Appraisal of EC Granted from DEIAA Bharatpur To SEIAA Rajasthan of existing… — lapsed, 0 m away
- Transfer of Earlier Granted EC from Sh. Devraj S/o Sh. Jindaram Panjabi to M/s… — lapsed, 0 m away
- Mining project by M/S Mahalaxmi Stone Crusher, Mineral-Masonry Stone, ML… — environmental approval granted, 550 m away
- Mining project by M/S Mahalaxmi Stone Crusher, Mineral-Masonry Stone, ML… — lapsed, 550 m away
- Existing (Non- Operational) Masonry Stone Mining Project, M.L. No. – 356/2007,… — lapsed, 550 m away
- Mining project by M/S Mahalaxmi Stone Crusher, Mineral-Masonry Stone, ML… — environmental approval granted, 550 m away
- "Re-Appraisal of EC Granted from DEIAA Bharatpur To SEIAA Rajasthan existing… — environmental approval granted, 600 m away
- "Transfer of Earlier EC Granted from Sh. Gaurav Sharma to Sh. Sumit Bhadana,… — lapsed, 600 m away
More from Kumar Infrastructure Development Private Limited in Bharatpur
- Re-Appraisal of EC Granted from DEIAA Bharatpur To SEIAA Rajasthan of existing… — lapsed
- Re-Appraisal of EC Granted from DEIAA Bharatpur To SEIAA Rajasthan existing… — environmental approval granted
- M/S Kumar Infrastructure Development PVT. LTD [re-Appraisal of Ec Granted From… — environmental approval granted
- Re-Appraisal of EC Granted from DEIAA, BHARATPUR to SEIAA Rajasthan existing… — environmental approval granted
- Re-Appraisal of EC Granted from DEIAA Bharatpur To SEIAA Rajasthan Existing… — environmental approval granted
7 Kumar Infrastructure Development projects in Bharatpur
All 8 Kumar Infrastructure Development projects across India