Quick answers
What is this project?
Proposed Masonry Stone Mining Project, Plot No.-171, Area- 1.3591 Ha, Near village- Jasol, Tehsil- Pachpadra, District – Balotra (Raj.) in favor of Maa Nagnechi Mines & Minerals Private Limited is an approved mining project in Asadha, Pachpadra, Barmer, Rajasthan. The site covers 3.4 acres.
Who is building it?
The applicant is Dariya Kanwar.
Has it been approved?
Yes. Its status is “Environmental approval granted” (since 8 Oct 2026), as of 27 Nov 2026.
Where is it?
In Asadha, Pachpadra, Barmer, Rajasthan.
How big is it?
It has a stated cost of ₹1.2 crore and a site of 3.4 acres.
When was it filed?
The application was filed on 29 Aug 2025.
Project details
| Status | Environmental approval granted |
|---|---|
| Status since | 8 Oct 2026 |
| Application filed | 29 Aug 2025 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Mining |
| Applicant | Dariya Kanwar |
| Land area | 3.4 acres (1.4 ha) |
| Project cost | ₹1.2 crore |
| Village / locality | Asadha |
| Taluk / tehsil | Pachpadra |
| District | Barmer |
| State | Rajasthan |
| Location from | Site boundary on record |
| Our reference | WID-RJ-23155 |
In context
878 applications in Barmer since January 2022 are in the same category (Mining): 465 approved, 100 filed or under review, and 313 withdrawn, lapsed or rejected. The approved ones took a median of 6 months from filing to approval. At 3.4 acres, this one is larger than 54% of them.
29 other mining leases have applied within 500 m of this site; together with this one they cover 93.3 acres. Under India's environmental rules, mining leases less than 500 m apart are assessed together as one cluster, so the combined area can decide which clearance is needed. 60 mining leases have applied within 5 km.
Where it is
Asadha, Pachpadra, Barmer, Rajasthan. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Proposed Masonry Stone Mining Project, Plot No.-171, Area- 1.3591 Ha, Near… — cleared for impact study, 0 m away
- Proposed Masonry Stone Mining Project Plot No.170, Area: 1.2099 Hect: Near… — environmental approval granted, 50 m away
- Proposed Masonry Stone Mining Project Plot No.170, Area: 1.2099 Hect: Near… — cleared for impact study, 50 m away
- Jasol Masonary Stone Mining Project Delineated Plot No.- 172 Village- Jasol,… — cleared for impact study, 100 m away
- Proposed Masonry Stone Mining Project; Plot No.- 169, Area: 1.4255 Hect., Near… — under environmental review, 150 m away
- Proposed Masonry Stone Mining Project ; Plot No.- 169, Khasra No.-433 , Area:… — cleared for impact study, 150 m away
- Re-Appraisal of Environmental Clearance Granted by Deiaa Barmer (Rajasthan) of… — environmental approval granted, 150 m away
- Re-Appraisal of Environmental Clearance Granted by Deiaa Barmer(Rajasthan) of… — lapsed, 150 m away
More from Dariya Kanwar in Barmer
- Proposed Masonry Stone Mining Project, Plot No.-171, Area- 1.3591 Ha, Near… — cleared for impact study
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.