One of 3 filings for this project. The project's main page, with every filing and where each stands: Regularization and Expansion of existing cable and wire (flexible) manufacturing unit…
Project details
| Status | Environmental approval granted |
|---|---|
| Status since | 18 Jan 2026 |
| Application filed | 8 Sept 2025 |
| Approval sought | Environmental approval |
| Application type | Expansion |
| Sector | Buildings & townships |
| Applicant | Havells India Limited |
| Use | Industrial |
| Parking spaces | 549 |
| Land area | 125 acres (50.6 ha) |
| Built-up area | 1,31,230 m² (14,12,547 sq ft) |
| Plot area | 3,47,714 m² (37,42,759 sq ft) |
| Project cost | ₹1,477.5 crore |
| Village / locality | Gundpur |
| Taluk / tehsil | Alwar |
| District | Alwar |
| State | Rajasthan |
| Location from | Site boundary on record |
| Our reference | WID-RJ-23550 |
All filings for this project
This project has 3 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| Expansion filed 4 Jul 2026 | Environmental approval granted | 125 acres | ₹1,477.5 crore |
| Early planning filed 19 May 2026 | Cleared for impact study | 125 acres | ₹1,477.5 crore |
| Expansion filed 8 Sept 2025 (this page) | Environmental approval granted | 125 acres | ₹1,477.5 crore |
In context
114 applications in Alwar since January 2022 are in the same category (Buildings & townships): 44 approved, 46 filed or under review, and 23 withdrawn, lapsed or rejected. The approved ones took a median of 4 months from filing to approval. At 125 acres, this one is larger than 92% of them.
26 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Gundpur, Alwar, Rajasthan. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Regularization and Expansion of existing cable and wire (flexible)… — environmental approval granted, 0 m away
- Regularization and Expansion of existing cable and wire (flexible)… — cleared for impact study, 0 m away
- Proposed White Cement Grinding Unit Capacity 384 Tpd (1,40,160 Tpa) — environmental approval granted, 300 m away
- Proposed White Cement Grinding Unit Capacity 384 Tpd (1,40,160 Tpa) — environmental approval granted, 300 m away
- White Cement Grinding Unit — cleared for impact study, 300 m away
- Regularization and Renovation of existing industrial shed by "M/s Mahesh… — environmental approval granted, 600 m away
- Amendment in Environment Clearance issued for Proposed Expansion of Caustic… — environmental approval granted, 700 m away
- Industrial Shed of "Mahesh Edible Agro Oil Industries Pvt. Ltd" — lapsed, 1000 m away
More from Havells India Limited in Alwar
- Industrial shed of Havells India Limited, Neemrana Unit — environmental approval granted
- Regularization of Industrial shed for Washing Machine, Air Conditioner and… — environmental approval granted
5 Havells India projects in Alwar
All 7 Havells India projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.