What is Developing? Open the mapMap

Environmental approval grantedBuildings & townships · Alwar, Rajasthan

Regularization and Expansion of existing cable and wire (flexible) manufacturing unit located at Plot Nos. A461, 462, SP215, 204 204A, MIA, Alwar, Rajasthan by M/s Havells India Limited

Regularization and Expansion of existing cable and wire (flexible) manufacturing unit located at Plot Nos. A461, 462, SP215, 204 204A, MIA, Alwar, Rajasthan by M/s Havells India Limited is an approved industrial building project in Gundpur, Alwar, Rajasthan. The site covers 125 acres. Its stated project cost is ₹1,477.5 crore. As of 27 Nov 2026, its status is “Environmental approval granted” (since 18 Jan 2026).

See it on the live map All projects in Alwar

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

One of 3 filings for this project. The project's main page, with every filing and where each stands: Regularization and Expansion of existing cable and wire (flexible) manufacturing unit…

Project details

StatusEnvironmental approval granted
Status since18 Jan 2026
Application filed8 Sept 2025
Approval soughtEnvironmental approval
Application typeExpansion
SectorBuildings & townships
ApplicantHavells India Limited
UseIndustrial
Parking spaces549
Land area125 acres (50.6 ha)
Built-up area1,31,230 m² (14,12,547 sq ft)
Plot area3,47,714 m² (37,42,759 sq ft)
Project cost₹1,477.5 crore
Village / localityGundpur
Taluk / tehsilAlwar
DistrictAlwar
StateRajasthan
Location fromSite boundary on record
Our referenceWID-RJ-23550

All filings for this project

This project has 3 applications on record. Each is a separate step (an impact study, an approval, an expansion…):

FilingStatusLandCost
Expansion filed 4 Jul 2026Environmental approval granted125 acres₹1,477.5 crore
Early planning filed 19 May 2026Cleared for impact study125 acres₹1,477.5 crore
Expansion filed 8 Sept 2025 (this page)Environmental approval granted125 acres₹1,477.5 crore

In context

114 applications in Alwar since January 2022 are in the same category (Buildings & townships): 44 approved, 46 filed or under review, and 23 withdrawn, lapsed or rejected. The approved ones took a median of 4 months from filing to approval. At 125 acres, this one is larger than 92% of them.

26 other applications of any kind have been filed within 5 km of this site since January 2022.

Where it is

Gundpur, Alwar, Rajasthan. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

More from Havells India Limited in Alwar

5 Havells India projects in Alwar
All 7 Havells India projects across India

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.