Project details
| Status | Lapsed |
|---|---|
| Status since | 24 Jun 2025 |
| Application filed | 1 Mar 2025 |
| Approval sought | Environmental approval |
| Application type | Early planning |
| Sector | Mining |
| Applicant | Combitic Global Caplet Private Limited |
| Land area | 4.4 acres (1.8 ha) |
| Project cost | ₹4 crore |
| Village / locality | Dera |
| Taluk / tehsil | Thanagazi |
| District | Alwar |
| State | Rajasthan |
| Location from | Site boundary on record |
| Our reference | WID-RJ-23563 |
In context
347 applications in Alwar since January 2022 are in the same category (Mining): 131 approved, 47 filed or under review, and 169 withdrawn, lapsed or rejected. The approved ones took a median of 4 months from filing to approval. At 4.4 acres, this one is larger than 82% of them.
6 other mining leases have applied within 500 m of this site; together with this one they cover 86.6 acres. Under India's environmental rules, mining leases less than 500 m apart are assessed together as one cluster, so the combined area can decide which clearance is needed. 9 mining leases have applied within 5 km.
Where it is
Dera, Thanagazi, Alwar, Rajasthan. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- This Is a Proposed Masonry Stone Mining Project, (Total Cluster Area- 23.94… — cleared for impact study, 50 m away
- Dera Masonry Stone Mining Project, Plot No. 16/2024, Plot area – 1.80 Hect.… — lapsed, 100 m away
- Dera Masonry Stone Mining Project, Plot No. 18/2024, Plot area – 1.80 Hect.… — lapsed, 100 m away
- Dera Masonry Stone Mining Project, Plot No. 15/2024, Plot area – 1.90 Hect.… — lapsed, 200 m away
- Dera Masonry Stone Mining Project, Plot No. 14/2024, Plot area – 1.80 Hect.… — lapsed, 300 m away
- Proposed Masonry Stone Mining Project, with Production Capacity 3,60,000 TPA… — cleared for impact study, 400 m away
- Proposed Masonry Stone Mining Project, with Production Capacity 3,60,000 TPA… — cleared for impact study, 500 m away
- Dera Masonry Stone Mining Project, Plot No. 10/2024, Plot area – 1.0 Hect.… — cleared for impact study, 600 m away
More from Combitic Global Caplet Private Limited in Alwar
- Dera Masonry Stone Mining Project, Plot No. 10/2024, Plot area – 1.0 Hect.… — cleared for impact study
- Dera Masonry Stone Mining Project, Plot No. 18/2024, Plot area – 1.80 Hect.… — lapsed
- Dera Masonry Stone Mining Project, Plot No. 16/2024, Plot area – 1.80 Hect.… — lapsed
- Dera Masonry Stone Mining Project, Plot No. 15/2024, Plot area – 1.90 Hect.… — lapsed
- Dera Masonry Stone Mining Project, Plot No. 14/2024, Plot area – 1.80 Hect.… — lapsed
- Dera Masonry Stone Mining Project, Plot No. 11/2024, Plot area – 1.0 Hect.… — lapsed
All 7 Combitic Global Caplet projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.