Project details
| Status | Cleared for impact study |
|---|---|
| Status since | 11 Jul 2025 |
| Application filed | 8 Jul 2025 |
| Approval sought | Environmental approval |
| Application type | Early planning |
| Sector | Mining |
| Applicant | J K Cement Limited |
| Land area | 11.9 acres (4.8 ha) |
| Project cost | ₹5.1 crore |
| Village / locality | Haripura |
| Taluk / tehsil | Kheenvsar |
| District | Nagaur |
| State | Rajasthan |
| Location from | Site boundary on record |
| Our reference | WID-RJ-24119 |
In context
2,161 applications in Nagaur since January 2022 are in the same category (Mining): 1,274 approved, 95 filed or under review, and 792 withdrawn, lapsed or rejected. The approved ones took a median of 4 months from filing to approval. At 11.9 acres, this one is larger than 93% of them.
10 other mining leases have applied within 500 m of this site; together with this one they cover 130.6 acres. Under India's environmental rules, mining leases less than 500 m apart are assessed together as one cluster, so the combined area can decide which clearance is needed. 17 mining leases have applied within 5 km.
Where it is
Haripura, Kheenvsar, Nagaur, Rajasthan. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Mining of Limestone (Major Minerals) Mining project, Block TKSB37, project… — environmental approval granted, 200 m away
- Mining of Limestone (Major Minerals) Mining project, Block TKSB37, project… — cleared for impact study, 200 m away
- TKSB - 23 Limestone Block with proposed Limestone production capacity of 40005… — cleared for impact study, 200 m away
- M/s Mundan Construction Company, Block No -TKSB31, Production… — lapsed, 250 m away
- M/s Mundan Construction Company, Block No. TKSB31, Mineral LimeStone — environmental approval granted, 250 m away
- M/s Mundan Construction Company, Block No -TKSB31, Production… — cleared for impact study, 250 m away
- M/s Mundan Construction Company, Block No. TKSB31, Mineral LimeStone — cleared for impact study, 250 m away
- Haripura Khodwa Limestone Block, Block No- TKSB 38 , AREA -4.80 Hect ,Near… — under environmental review, 300 m away
More from J K Cement Limited in Nagaur
- Proposed production of Calcined Clay- 2,62,500 TPA & LC3 -5,08,200 TPA (Grey… — initial checks
- TKSB - 23 Limestone Block with proposed Limestone production capacity of 40005… — cleared for impact study
- TKSB - 17 Limestone Block with proposed Limestone production capacity of 15000… — cleared for impact study
4 J K Cement projects in Nagaur
All 67 J K Cement projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.