What is Developing? Open the mapMap

LapsedMining · Sirohi, Rajasthan

Re Appraisal of EC Granted from DEIAA, Sirohi of "Marble (Minor Mineral) Mining Project" (Plot Area 1.0 ha. and M.L. No. – 45/1997 {Old M.L. No-106/1987})with production capacity 70,421 TPA by M/s. Pooja Marble Mines as per MoEF&CC OM Dated 28.04.2023

Re Appraisal of EC Granted from DEIAA, Sirohi of "Marble (Minor Mineral) Mining Project" (Plot Area 1.0 ha. and M.L. No. – 45/1997 {Old M.L. No-106/1987})with production capacity 70,421 TPA by M/s. Pooja Marble Mines as per MoEF&CC OM Dated 28.04.2023 is a lapsed mining project in Selwara, Reodar, Sirohi, Rajasthan. The site covers 2.5 acres. Its stated project cost is ₹1 crore. As of 27 Nov 2026, its status is “Lapsed” (since 9 Oct 2025).

See it on the live map All projects in Sirohi

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Project details

Official titleRe Appraisal of EC Granted from DEIAA, Sirohi of "Marble (Minor Mineral) Mining Project" (Plot Area 1.0 ha. and M.L. No. – 45/1997 {Old M.L. No-106/1987})with production capacity 70,421 TPA, at Near Village – Selwara, Tehsil – Reodar, Distt - Sirohi, (Rajasthan) by M/s. Pooja Marble Mines as per MoEF&CC OM Dated 28.04.2023.
StatusLapsed
Status since9 Oct 2025
Application filed8 May 2025
Approval soughtEnvironmental approval
Application typeNew project
SectorMining
ApplicantShanti
Land area2.5 acres (1 ha)
Project cost₹1 crore
Village / localitySelwara
Taluk / tehsilReodar
DistrictSirohi
StateRajasthan
Location fromSite boundary on record
Our referenceWID-RJ-24199

In context

511 applications in Sirohi since January 2022 are in the same category (Mining): 274 approved, 42 filed or under review, and 195 withdrawn, lapsed or rejected. The approved ones took a median of 3 months from filing to approval. At 2.5 acres, this one is smaller than 86% of them.

45 other mining leases have applied within 500 m of this site; together with this one they cover 1,56,419.8 acres. Under India's environmental rules, mining leases less than 500 m apart are assessed together as one cluster, so the combined area can decide which clearance is needed. 94 mining leases have applied within 5 km.

Where it is

Selwara, Reodar, Sirohi, Rajasthan. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.