Quick answers
What is this project?
of Bajri (River Sand) Mining Project (Plot No. –7, Khasra No – 421,422& 853) near Villages – Satwada and Santhali, Tehsil – Deoli, District – Tonk, State - Rajasthan, Applied Area : 83.64 Hect is a lapsed mining project in Satwara, Deoli, Tonk, Rajasthan. The site covers 206.7 acres.
Who is building it?
The applicant is Ranveer Singh Rathore.
Has it been approved?
No. The application was lapsed on 12 May 2026, so it is no longer under consideration.
Where is it?
In Satwara, Deoli, Tonk, Rajasthan.
How big is it?
It has a stated cost of ₹3.5 crore and a site of 206.7 acres.
When was it filed?
The application was filed on 29 Sept 2025.
One of 2 filings for this project. The project's main page, with every filing and where each stands: of Bajri (River Sand) Mining Project (Plot No. –7, Khasra No – 421,422& 853) near…
Project details
| Status | Lapsed |
|---|---|
| Status since | 12 May 2026 |
| Application filed | 29 Sept 2025 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Mining |
| Applicant | Ranveer Singh Rathore |
| Land area | 206.7 acres (83.6 ha) |
| Project cost | ₹3.5 crore |
| Village / locality | Satwara |
| Taluk / tehsil | Deoli |
| District | Tonk |
| State | Rajasthan |
| Location from | Site boundary on record |
| Our reference | WID-RJ-24237 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| New project filed 29 Sept 2025 (this page) | Lapsed | 206.7 acres | ₹3.5 crore |
| Early planning filed 19 May 2025 | Cleared for impact study | 206.7 acres | ₹3.5 crore |
In context
362 applications in Tonk since January 2022 are in the same category (Mining): 227 approved, 30 filed or under review, and 105 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 206.7 acres, this one is larger than 93% of them.
No other mining lease on record is within 500 m of this site; 13 have applied within 5 km.
Where it is
Satwara, Deoli, Tonk, Rajasthan. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- of Bajri (River Sand) Mining Project (Plot No. –7, Khasra No – 421,422& 853)… — cleared for impact study, 0 m away
- River Sand (Bajri) Mining Project (Minor Mineral), Plot No.-06, Mining… — environmental approval granted, 500 m away
- River Sand (Bajri) Mining Project (Minor Mineral), Plot No.-06, Mining… — cleared for impact study, 500 m away
- River Sand (Bajri) Mining Project (Minor Mineral), Plot No.-05, Mining… — environmental approval granted, 1.2 km away
- River Sand (Bajri) Mining Project (Minor Mineral), Plot No.-05, Mining… — cleared for impact study, 1.2 km away
- River Sand (Bajri) Mining Project (Minor Mineral), Plot No.- BJ-44 Bajri Plot… — cleared for impact study, 1.3 km away
- Environment Clearance for Mining of Bajri (Minor Mineral- River Sand) from the… — cleared for impact study, 2 km away
- River Sand (Bajri) Mining Project (Minor Mineral), Plot No.-04, Mining… — lapsed, 2.1 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.