Quick answers
What is this project?
Modia Mansar Bajri Cluster Project, Cluster NO. 12-E, Cluster Area- 16.2448, Near Village- Modia Mansar, Tehsil- Kolayat, District- Bikaner (Raj.) is a lapsed mining project in Khari Charnan, Kolayat, Bikaner, Rajasthan. The site covers 40.1 acres.
Who is building it?
The applicant is Dheeraj Panwar.
Has it been approved?
No. The application was lapsed on 24 Aug 2026, so it is no longer under consideration.
Where is it?
In Khari Charnan, Kolayat, Bikaner, Rajasthan.
How big is it?
It has a stated cost of ₹13 crore and a site of 40.1 acres.
When was it filed?
The application was filed on 16 Sept 2025.
One of 2 filings for this project. The project's main page, with every filing and where each stands: Modia Mansar Bajri Cluster Project, Cluster NO. 12-E, Cluster Area- 16.2448, Near…
Project details
| Status | Lapsed |
|---|---|
| Status since | 24 Aug 2026 |
| Application filed | 16 Sept 2025 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Mining |
| Applicant | Dheeraj Panwar |
| Land area | 40.1 acres (16.2 ha) |
| Project cost | ₹13 crore |
| Village / locality | Khari Charnan |
| Taluk / tehsil | Kolayat |
| District | Bikaner |
| State | Rajasthan |
| Location from | Site boundary on record |
| Our reference | WID-RJ-24525 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| New project filed 16 Sept 2025 (this page) | Lapsed | 40.1 acres | ₹13 crore |
| Early planning filed 30 Mar 2024 | Cleared for impact study | 40.1 acres | ₹13 crore |
In context
516 applications in Bikaner since January 2022 are in the same category (Mining): 270 approved, 60 filed or under review, and 186 withdrawn, lapsed or rejected. The approved ones took a median of 5 months from filing to approval. At 40.1 acres, this one is larger than 92% of them.
No other mining lease on record is within 500 m of this site; 9 have applied within 5 km.
Where it is
Khari Charnan, Kolayat, Bikaner, Rajasthan. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Modia Mansar Bajri Cluster Project, Cluster NO. 12-E, Cluster Area- 16.2448,… — cleared for impact study, 0 m away
- Proposed Ball Clay & Silica Sand Mining Project M.L.No.-(37/2022 Refrence No.… — environmental approval granted, 1.2 km away
- Proposed Ball Clay, Silica Sand,Bajri ,Gravel & Murrum Mining Project,… — lapsed, 1.4 km away
- Ball Clay Silica Sand Kankar and Murrum Mining Project Ref No 20211000045947 — under environmental review, 2.1 km away
- Ball Clay Silica Sand Kankar and Murrum Mining Project Ref No 20211000045947 — cleared for impact study, 2.1 km away
- Ball Clay Silica Sand Kankar and Murrum Mining Project M L No 39/2021 — environmental approval granted, 2.5 km away
- Ball Clay Silica Sand Kankar and Murrum Mining Project M L No 39/2021 — cleared for impact study, 2.5 km away
- Ball Clay, Silica Sand, Murrum Mining Project, M. L. No. 23/2022 (Ref. No.… — environmental approval granted, 3.1 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.