What is Developing? Open the mapMap

LapsedMining · Jodhpur, Rajasthan

Regarding Grant of TOR of our Proposed Sand Stone Mining Project Q.L Plot No.- 128, Area- 1.00 Ha, Near Village:- Khirja Fatehsingh ,Tehsil:-Shergarh ,District:- Jodhpur (Raj.) of applicant Smt.Utaba W/O Shri Shailendra Kumar

Regarding Grant of TOR of our Proposed Sand Stone Mining Project Q.L Plot No.- 128, Area- 1.00 Ha, Near Village:- Khirja Fatehsingh ,Tehsil:-Shergarh ,District:- Jodhpur (Raj.) of applicant Smt.Utaba W/O Shri Shailendra Kumar is a lapsed mining project in Khirja Fathesingh, Shergarh, Jodhpur, Rajasthan. The site covers 2.5 acres. Its stated project cost is ₹1.2 crore. As of 27 Nov 2026, its status is “Lapsed” (since 3 Sept 2025).

See it on the live map All projects in Jodhpur

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Quick answers

What is this project?

Regarding Grant of TOR of our Proposed Sand Stone Mining Project Q.L Plot No.- 128, Area- 1.00 Ha, Near Village:- Khirja Fatehsingh ,Tehsil:-Shergarh ,District:- Jodhpur (Raj.) of applicant Smt.Utaba W/O Shri Shailendra Kumar is a lapsed mining project in Khirja Fathesingh, Shergarh, Jodhpur, Rajasthan. The site covers 2.5 acres.

Who is building it?

The applicant is Utaba.

Has it been approved?

No. The application was lapsed on 3 Sept 2025, so it is no longer under consideration.

Where is it?

In Khirja Fathesingh, Shergarh, Jodhpur, Rajasthan.

How big is it?

It has a stated cost of ₹1.2 crore and a site of 2.5 acres.

When was it filed?

The application was filed on 17 Mar 2025.

Project details

StatusLapsed
Status since3 Sept 2025
Application filed17 Mar 2025
Approval soughtEnvironmental approval
Application typeEarly planning
SectorMining
ApplicantUtaba
Land area2.5 acres (1 ha)
Project cost₹1.2 crore
Village / localityKhirja Fathesingh
Taluk / tehsilShergarh
DistrictJodhpur
StateRajasthan
Location fromSite boundary on record
Our referenceWID-RJ-25002

In context

11,954 applications in Jodhpur since January 2022 are in the same category (Mining): 4,406 approved, 210 filed or under review, and 7,338 withdrawn, lapsed or rejected. The approved ones took a median of 7 months from filing to approval. At 2.5 acres, this one is larger than 90% of them.

5 other mining leases have applied within 500 m of this site; together with this one they cover 13.3 acres. Under India's environmental rules, mining leases less than 500 m apart are assessed together as one cluster, so the combined area can decide which clearance is needed. 2,337 mining leases have applied within 5 km.

Where it is

Khirja Fathesingh, Shergarh, Jodhpur, Rajasthan. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.