Quick answers
What is this project?
Sandstone (Minor Mineral) Mining Project, Plot No. 33, Area- 1.00 Ha., with Production Capacity 1,00,178 TPA (ROM), Located Near Village- Kasti, Tehsil– Baori & District– Jodhpur (Rajasthan) by Shri Anil Jangid S/o Shri Om Prakash Jangid is a lapsed mining project in Kasti, Baori, Jodhpur, Rajasthan. The site covers 2.5 acres.
Who is building it?
The applicant is SH. Anil Jangid S/O SH. Om Prakash Jangid.
Has it been approved?
No. The application was lapsed on 17 Oct 2025, so it is no longer under consideration.
Where is it?
In Kasti, Baori, Jodhpur, Rajasthan.
How big is it?
It has a stated cost of ₹50 lakh and a site of 2.5 acres.
When was it filed?
The application was filed on 8 Jul 2025.
Project details
| Status | Lapsed |
|---|---|
| Status since | 17 Oct 2025 |
| Application filed | 8 Jul 2025 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Mining |
| Applicant | SH. Anil Jangid S/O SH. Om Prakash Jangid |
| Land area | 2.5 acres (1 ha) |
| Project cost | ₹50 lakh |
| Village / locality | Kasti |
| Taluk / tehsil | Baori |
| District | Jodhpur |
| State | Rajasthan |
| Location from | Site boundary on record |
| Our reference | WID-RJ-25122 |
In context
11,954 applications in Jodhpur since January 2022 are in the same category (Mining): 4,406 approved, 210 filed or under review, and 7,338 withdrawn, lapsed or rejected. The approved ones took a median of 7 months from filing to approval. At 2.5 acres, this one is larger than 90% of them.
43 other mining leases have applied within 500 m of this site; together with this one they cover 108.7 acres. Under India's environmental rules, mining leases less than 500 m apart are assessed together as one cluster, so the combined area can decide which clearance is needed. 174 mining leases have applied within 5 km.
Where it is
Kasti, Baori, Jodhpur, Rajasthan. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Sandstone (Minor Mineral) Mining Project with Production Capacity 1,00,178TPA… — more information requested, 0 m away
- Sandstone (Minor Mineral) Mining Project with Production Capacity 1,00,178TPA… — returned to applicant, 0 m away
- Sandstone (Minor Mineral) Mining Project with Production Capacity1,69,065 TPA… — more information requested, 100 m away
- Proposed Project of Sand Stone Mining Project ( ML Area 1.0 ha and Plot No.-… — lapsed, 100 m away
- Sandstone (Minor Mineral) Mining Project with Production Capacity1,69,065 TPA… — returned to applicant, 100 m away
- Sandstone Mining Project, Plot No.- 40 & Area 1.00 ha. with production… — lapsed, 100 m away
- Kasti Sandstone Mine (Plot No 34/2025) — lapsed, 100 m away
- Sandstone Mining Project (M.L. Area 1.00 ha and Plot No. 30) with production… — lapsed, 100 m away
More from SH. Anil Jangid S/O SH. Om Prakash Jangid in Jodhpur
- Sandstone (Minor Mineral) Mining Project with Production Capacity 1,00,178TPA… — more information requested
- Sandstone (Minor Mineral) Mining Project with Production Capacity 1,00,178TPA… — returned to applicant
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.