Project details
| Status | Cleared for impact study |
|---|---|
| Status since | 21 Oct 2025 |
| Application filed | 14 Oct 2025 |
| Approval sought | Environmental approval |
| Application type | Early planning |
| Sector | Mining |
| Applicant | Kishan Gopal Sharma |
| Land area | 5.8 acres (2.4 ha) |
| Project cost | ₹50 lakh |
| Village / locality | Dujar |
| Taluk / tehsil | Ladnu |
| District | Nagaur |
| State | Rajasthan |
| Location from | Site boundary on record |
| Our reference | WID-RJ-25185 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| New project filed 3 Nov 2026 | Initial checks | 5.8 acres | ₹50 lakh |
| Early planning filed 14 Oct 2025 (this page) | Cleared for impact study | 5.8 acres | ₹50 lakh |
In context
2,161 applications in Nagaur since January 2022 are in the same category (Mining): 1,274 approved, 95 filed or under review, and 792 withdrawn, lapsed or rejected. The approved ones took a median of 4 months from filing to approval. At 5.8 acres, this one is larger than 74% of them.
4 other mining leases have applied within 500 m of this site; together with this one they cover 20.4 acres. Under India's environmental rules, mining leases less than 500 m apart are assessed together as one cluster, so the combined area can decide which clearance is needed. 19 mining leases have applied within 5 km.
Where it is
Dujar, Ladnu, Nagaur, Rajasthan. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- New Proposal for Masonry Stone Mining, Ref. No. -202510000126625, M.L. No.… — initial checks, 0 m away
- Shri Shrvanram Rahar (Masonry Stone (Minor Mineral) mining project in cluster… — environmental approval granted, 200 m away
- This is the new project Proposed for Masonry Stone Mining, Ref. No.… — under environmental review, 250 m away
- This is the new project Proposed for Masonry Stone Mining, Ref. No.… — cleared for impact study, 250 m away
- This is an Existing Project for Re-Appraisal of EC Granted from DEIAA Nagaur… — lapsed, 400 m away
- Shri Balkrishan Swami, Masonary Stone Mining Project (Ref No.202510000131310) — under environmental review, 450 m away
- Shri Balkrishan Swami, Masonary Stone Mining Project (Ref No.202510000131310) — cleared for impact study, 450 m away
- Re-Appraisal of EC Granted from DEIAA Nagaur to SEIAA Rajasthan, for existing… — environmental approval granted, 700 m away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.