Quick answers
What is Masonry Stone Mining Project, M.L. No. 25/1999?
Masonry Stone Mining Project, M.L. No. 25/1999 is an approved mining project in Muhami, Ajmer, Rajasthan. The site covers 2.5 acres.
Who is building it?
The applicant is Sampat Devi Rawat.
Has it been approved?
Yes. Its status is “Environmental approval granted” (since 10 Jun 2025), as of 27 Nov 2026.
Where is it?
In Muhami, Ajmer, Rajasthan.
How big is it?
It has a stated cost of ₹25 lakh and a site of 2.5 acres.
When was it filed?
The application was filed on 14 Feb 2025.
Project details
| Status | Environmental approval granted |
|---|---|
| Status since | 10 Jun 2025 |
| Application filed | 14 Feb 2025 |
| Approval sought | Environmental approval |
| Application type | Ownership transfer |
| Sector | Mining |
| Applicant | Sampat Devi Rawat |
| Land area | 2.5 acres (1 ha) |
| Project cost | ₹25 lakh |
| Village / locality | Muhami |
| Taluk / tehsil | Ajmer |
| District | Ajmer |
| State | Rajasthan |
| Location from | Site boundary on record |
| Our reference | WID-RJ-25821 |
In context
1,559 applications in Ajmer since January 2022 are in the same category (Mining): 904 approved, 102 filed or under review, and 553 withdrawn, lapsed or rejected. The approved ones took a median of 4 months from filing to approval. At 2.5 acres, this one is smaller than 96% of them.
No other mining lease on record is within 500 m of this site; 2 have applied within 5 km.
Where it is
Muhami, Ajmer, Rajasthan. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Reappraisal of the EC granted by DEIAA Ajmer for Masonry Stone Mining Project,… — environmental approval granted, 0 m away
- M/s Shree Ram Minerals, Quartz Feldspar Mine, ML No.30/83(138/2004R) — lapsed, 3.2 km away
- Shri Beeram Singh, Quartz & Feldspar Mine, ML No.525/2005 — lapsed, 4.7 km away
- Shri Sanjay Kumar Soni [reappraisal of Ec From Deiaa to Seiaa for Masonry… — environmental approval granted, 5.1 km away
- Diversion of Forest Land for the Construction of Mor Sagar Artificial Reservior — under forest review, 5.4 km away
- Shri Abdul Jabbar S/O Shri Habib Khan [fresh Proposal for "masonry Stone… — more information requested, 6.6 km away
- Shri Bansi Lal Regar [reappraisal of Ec From Deiaa to Seiaa for Masonry Stone… — environmental approval granted, 6.8 km away
- Reconnaissance survey for Cu, Mo and associated mineralization in Chhota… — lapsed, 7.2 km away
More from Sampat Devi Rawat in Ajmer
- Reappraisal of the EC granted by DEIAA Ajmer for Masonry Stone Mining Project,… — environmental approval granted
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.