What is Developing? Open the mapMap

Cleared for impact studyMining · Nagaur, Rajasthan

Proposed China Clay (Minor Mineral) mining project "[ML No.-03/2024, over an area – 3.00 Hectare, Cluster Area-110.9605 Ha, with proposed Production capacity – 4,31,976 TPA (ROM) {China Clay Saleable- 71006 TPA, Sub Grade Mineral-4176 TPA, Waste- 8354 TPA, Overburden-338862 & Soil-9578 TPA } located at Khasra No.- 357,358,359,6021/347,352, Near Village -Indawar, Tehsil– Merta, District – Nagaur (Rajasthan) proposed by Applicant Shri Mahipal Jain S/o Shri Sajjan Raj.

Proposed China Clay (Minor Mineral) mining project "[ML No.-03/2024, over an area – 3.00 Hectare, Cluster Area-110.9605 Ha, with proposed Production capacity – 4,31,976 TPA (ROM) {China Clay Saleable- 71006 TPA, Sub Grade Mineral-4176 TPA, Waste- 8354 TPA, Overburden-338862 & Soil-9578 TPA } located at Khasra No.- 357,358,359,6021/347,352, Near Village -Indawar, Tehsil– Merta, District – Nagaur (Rajasthan) proposed by Applicant Shri Mahipal Jain S/o Shri Sajjan Raj is a proposed mining project in Indawer, Merta, Nagaur, Rajasthan. The site covers 7.4 acres. Its stated project cost is ₹60 lakh. As of 27 Nov 2026, its status is “Cleared for impact study” (since 4 Mar 2025).

See it on the live map All projects in Nagaur

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Project details

StatusCleared for impact study
Status since4 Mar 2025
Application filed24 Feb 2025
Approval soughtEnvironmental approval
Application typeEarly planning
SectorMining
ApplicantMahipal Jain
Land area7.4 acres (3 ha)
Project cost₹60 lakh
Village / localityIndawer
Taluk / tehsilMerta
DistrictNagaur
StateRajasthan
Location fromSite boundary on record
Our referenceWID-RJ-25955

All filings for this project

This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):

FilingStatusLandCost
New project filed 19 Oct 2026Under environmental review7.4 acres₹60 lakh
Early planning filed 24 Feb 2025 (this page)Cleared for impact study7.4 acres₹60 lakh

In context

2,161 applications in Nagaur since January 2022 are in the same category (Mining): 1,274 approved, 95 filed or under review, and 792 withdrawn, lapsed or rejected. The approved ones took a median of 4 months from filing to approval. At 7.4 acres, this one is larger than 77% of them.

4 other mining leases have applied within 500 m of this site; together with this one they cover 31.6 acres. Under India's environmental rules, mining leases less than 500 m apart are assessed together as one cluster, so the combined area can decide which clearance is needed. 59 mining leases have applied within 5 km.

Where it is

Indawer, Merta, Nagaur, Rajasthan. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.