One of 2 filings for this project. The project's main page, with every filing and where each stands: Expansion in Production capacity of Earlier Granted EC Proposed from 28466 TPA (ROM) to…
Project details
| Official title | Expansion in Production capacity of Earlier Granted EC Proposed from 28466 TPA (ROM) to 444155 TPA (ROM) {Ore– 3, 00,184 TPA; Mineral Reject– 85,768 TPA; Sub Grade-42,882 TPA; OB - 15321 TPA}, "Quartz & Feldspar (Major Mineral) mining project" [M.L.No.-220/2007] over an Area of 4.2048 Hectare located at Near Village– Tikhi, Tehsil– Deogarh and District– Rajsamand (Rajasthan) by M/s A to Z Mines and Minerals. |
|---|---|
| Status | Withdrawn |
| Status since | 23 May 2025 |
| Application filed | 23 May 2025 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Mining |
| Applicant | Laik Ahmed |
| Land area | 10.4 acres (4.2 ha) |
| Project cost | ₹1.5 crore |
| Village / locality | Pitampura |
| Taluk / tehsil | Deogarh |
| District | Rajsamand |
| State | Rajasthan |
| Location from | Site boundary on record |
| Our reference | WID-RJ-26109 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| Early planning filed 20 Jun 2025 | Cleared for impact study | 10.4 acres | ₹1.5 crore |
| New project filed 23 May 2025 (this page) | Withdrawn | 10.4 acres | ₹1.5 crore |
In context
2,730 applications in Rajsamand since January 2022 are in the same category (Mining): 1,694 approved, 129 filed or under review, and 907 withdrawn, lapsed or rejected. The approved ones took a median of 5 months from filing to approval. At 10.4 acres, this one is larger than 80% of them.
No other mining lease on record is within 500 m of this site; 116 have applied within 5 km.
Where it is
Pitampura, Deogarh, Rajsamand, Rajasthan. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Expansion in Production capacity of Earlier Granted EC Proposed from 28466 TPA… — lapsed, 0 m away
- Expansion in Production capacity of Earlier Granted EC Proposed from 28466 TPA… — withdrawn, 0 m away
- This is an Existing "Quartz & Feldspar (Minor Mineral) mining project" for… — environmental approval granted, 0 m away
- Transfer of Earlier Granted EC from M/s Om Ratneshwari Minerals to M/s A to Z… — lapsed, 0 m away
- Expansion in Production capacity of Earlier Granted EC Proposed from 28466 TPA… — cleared for impact study, 50 m away
- This is an Existing Project for "Re-Appraisal of EC Granted from DEIAA… — lapsed, 700 m away
- Transfer of Earlier Granted EC from Shri Shivjeet Singh Gurjar S/o Shri… — lapsed, 700 m away
- Mandawara Quartz & Feldspar Mine N/V Mandawara, Tehsil- Deogarh, Dist-… — lapsed, 800 m away
More from Laik Ahmed in Rajsamand
- Expansion in Production capacity of Earlier Granted EC Proposed from 28466 TPA… — lapsed
- Expansion in Production capacity of Earlier Granted EC Proposed from 28466 TPA… — withdrawn
- This is an Existing "Quartz & Feldspar (Minor Mineral) mining project" for… — environmental approval granted
- Transfer of Earlier Granted EC from M/s Om Ratneshwari Minerals to M/s A to Z… — lapsed
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.