Quick answers
What is Khanda/Phyllite Schist Mining Project, Q.L No. 28(Bar-B)?
Khanda/Phyllite Schist Mining Project, Q.L No. 28(Bar-B) is a lapsed mining project in Bar, Raipur, Pali, Rajasthan. The site covers 0.4 acres.
Who is building it?
The applicant is Mahendra Kumar.
Has it been approved?
No. The application was lapsed on 13 Sept 2025, so it is no longer under consideration.
Where is it?
In Bar, Raipur, Pali, Rajasthan.
How big is it?
It has a stated cost of ₹10 lakh and a site of 0.4 acres.
When was it filed?
The application was filed on 10 Apr 2025.
Project details
| Status | Lapsed |
|---|---|
| Status since | 13 Sept 2025 |
| Application filed | 10 Apr 2025 |
| Approval sought | Environmental approval |
| Application type | Ownership transfer |
| Sector | Mining |
| Applicant | Mahendra Kumar |
| Land area | 1,800 m² |
| Project cost | ₹10 lakh |
| Village / locality | Bar |
| Taluk / tehsil | Raipur |
| District | Pali |
| State | Rajasthan |
| Location from | Site boundary on record |
| Our reference | WID-RJ-26506 |
In context
1,118 applications in Pali since January 2022 are in the same category (Mining): 623 approved, 93 filed or under review, and 402 withdrawn, lapsed or rejected. The approved ones took a median of 4 months from filing to approval. At 0.4 acres, this one is smaller than 100% of them.
9 other mining leases have applied within 500 m of this site; together with this one they cover 4.4 acres. Under India's environmental rules, mining leases less than 500 m apart are assessed together as one cluster, so the combined area can decide which clearance is needed. 36 mining leases have applied within 5 km.
Where it is
Bar, Raipur, Pali, Rajasthan. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Reappraisal of the EC granted by DEIAA Pali for Khanda/Phyllite Schist Mining… — lapsed, 0 m away
- "Reappraisal of the EC granted by DEIAA Pali for Khanda/Phyllite Schist Mining… — lapsed, 50 m away
- EC Re-appraisal of existing Khanda/Philiteschist quarry mine QL No. 6(Bar-B)… — lapsed, 100 m away
- EC Re-appraisal of existing Khanda/Philiteschist quarry mine (QL No. 4 Bar-B &… — lapsed, 150 m away
- "Reappraisal of the EC granted by DEIAA Pali for Khanda/Phyliteschist Mining… — lapsed, 150 m away
- Khanda/Pati-Katla/Phyllite Schist Mining Project, Q.L. No: 45 (15-C) — lapsed, 200 m away
- Reappraisal of the EC granted by DEIAA Pali for Khanda/Pati-Katla/Phyllite… — lapsed, 200 m away
- EC Re-appraisal of existing Khanda/Philiteschist quarry mine (QL No. 67(Bar-C)… — lapsed, 350 m away
More from Mahendra Kumar in Pali
- Existing Masonry stone mining project ML No. 481/1996, Area 1.0 Ha. Near… — lapsed
- Undri B Masonry Stone Mining project Nv- Undri B, Tehsil Sumerpur, Dist. Pali… — lapsed
- Expansion due to Mineral Inclusion of Granite in Existing Masonry Stone Mining… — lapsed
- Reappraisal of the EC granted by DEIAA Pali for Khanda/Phyllite Schist Mining… — lapsed
- Expansion due to Mineral Inclusion of Granite in Existing Masonry Stone Mining… — cleared for impact study
- Expainson due to Mineral Inclusion of Granite in Existing Masonry Stone Mining… — withdrawn
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.