Quick answers
What is this project?
Proposed Masonry Stone Mining Project; Plot. No.:- 184, Area: 2.0 Hect., Near Village- Pabunagar, Tehsil- Osia, District- Jodhpur (Raj.) in favor of M/s. Akshay Construction Company (Prop. Shri Rahul Choudhary S/o Shri Bhagirath Ram) is an approved mining project in Haripura, Osian, Jodhpur, Rajasthan. The site covers 4.9 acres.
Who is building it?
The applicant is Rahul Choudhary.
Has it been approved?
Yes. Its status is “Environmental approval granted” (since 5 Jan 2026), as of 27 Nov 2026.
Where is it?
In Haripura, Osian, Jodhpur, Rajasthan.
How big is it?
It has a stated cost of ₹1.2 crore and a site of 4.9 acres.
When was it filed?
The application was filed on 4 Jun 2025.
Project details
| Status | Environmental approval granted |
|---|---|
| Status since | 5 Jan 2026 |
| Application filed | 4 Jun 2025 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Mining |
| Applicant | Rahul Choudhary |
| Land area | 4.9 acres (2 ha) |
| Project cost | ₹1.2 crore |
| Village / locality | Haripura |
| Taluk / tehsil | Osian |
| District | Jodhpur |
| State | Rajasthan |
| Location from | Site boundary on record |
| Our reference | WID-RJ-26768 |
In context
11,954 applications in Jodhpur since January 2022 are in the same category (Mining): 4,406 approved, 210 filed or under review, and 7,338 withdrawn, lapsed or rejected. The approved ones took a median of 7 months from filing to approval. At 4.9 acres, this one is larger than 97% of them.
3 other mining leases have applied within 500 m of this site; together with this one they cover 21.6 acres. Under India's environmental rules, mining leases less than 500 m apart are assessed together as one cluster, so the combined area can decide which clearance is needed. 10 mining leases have applied within 5 km.
Where it is
Haripura, Osian, Jodhpur, Rajasthan. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Proposed Masonry Stone Mining Project; Plot. No.- 186, Area: 2.75 Hect. Near… — environmental approval granted, 200 m away
- Aa — lapsed, 200 m away
- Proposed Masonry Stone Mining Project, Plot No.- 182, Area: 2.00 Hect.; Near… — lapsed, 200 m away
- TOR for Proposed Masonry Stone Cluster Mining Project, Plot No. 197, Area 2.75… — lapsed, 1.1 km away
- Proposed Sand Stone Mining Project; Plot No. -212/2025, Area: 1.42 Hect. Near… — lapsed, 4.2 km away
- Proposed Sand Stone Mining Project; Plot No. -211/2025, Area: 2.0 Hect. Near… — lapsed, 4.2 km away
- Sandstone mine, Plot No.- 210, Area-2.0 ha, N./v- Sirmandi, Tehsil-Osian,… — under environmental review, 4.2 km away
- Proposed Sandstone Mining Project, Plot No-207/2025, Area :- 2.00 ha., Near… — cleared for impact study, 4.3 km away
More from Rahul Choudhary in Jodhpur
- Proposed Rhyolite (Masonry Stone) Mining Project ; Ref No.- 20221000062655,… — environmental approval granted
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.