What is Developing? Open the mapMap

LapsedMining · Udaipur, Rajasthan

Reappraisal of Earlier Granted EC by DEIAA, Udaipur, Vide Letter No.DEIAA/DEAC/UDR/Sectt/Cat. 1(a)B2(EC)/2016-17/1271 dated 31/05/2016 with Production Capacity: - 23911 TPA of Existing Serpentine Mining Project, Area- 1.00 Ha., M.L. No. 11/2000, Near Village- Pipali, Tehsil - Kherwara, Dist.- Udaipur (Raj.) of applicant M/s Maa Kamal Marble

Reappraisal of Earlier Granted EC by DEIAA, Udaipur, Vide Letter No.DEIAA/DEAC/UDR/Sectt/Cat. 1(a)B2(EC)/2016-17/1271 dated 31/05/2016 with Production Capacity: - 23911 TPA of Existing Serpentine Mining Project, Area- 1.00 Ha., M.L. No. 11/2000, Near Village- Pipali, Tehsil - Kherwara, Dist.- Udaipur (Raj.) of applicant M/s Maa Kamal Marble is a lapsed mining project in Pipali-A, Rishabhdeo, Udaipur, Rajasthan. The site covers 2.5 acres. Its stated project cost is ₹90 lakh. As of 27 Nov 2026, its status is “Lapsed” (since 23 Apr 2025).

See it on the live map All projects in Udaipur

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Project details

Official titleProposal for Reappraisal of Earlier Granted EC by DEIAA, Udaipur, Vide Letter No.DEIAA/DEAC/UDR/Sectt/Cat. 1(a)B2(EC)/2016-17/1271 dated 31/05/2016 with Production Capacity: - 23911 TPA of Existing Serpentine Mining Project, Area- 1.00 Ha., M.L. No. 11/2000, Near Village- Pipali, Tehsil - Kherwara, Dist.- Udaipur (Raj.) of applicant M/s Maa Kamal Marble
StatusLapsed
Status since23 Apr 2025
Application filed22 Mar 2025
Approval soughtEnvironmental approval
Application typeNew project
SectorMining
ApplicantMaa Kamal Marble
Land area2.5 acres (1 ha)
Project cost₹90 lakh
Village / localityPipali-A
Taluk / tehsilRishabhdeo
DistrictUdaipur
StateRajasthan
Location fromSite boundary on record
Our referenceWID-RJ-26994

In context

887 applications in Udaipur since January 2022 are in the same category (Mining): 493 approved, 45 filed or under review, and 349 withdrawn, lapsed or rejected. The approved ones took a median of 5 months from filing to approval. At 2.5 acres, this one is smaller than 95% of them.

No other mining lease on record is within 500 m of this site; 1 has applied within 5 km.

Where it is

Pipali-A, Rishabhdeo, Udaipur, Rajasthan. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.