Quick answers
What is this project?
Proposed River Sand (Bajri) Mining Project, Plot No.05, Area – 18.6128 Ha. (Govt. land), Near Village- Kushalpura, Tehsil - Raipur, Dist.- Beawar (Ajmer), (Raj.) of Applicant Shri Sandeep Choudhary S/o Shri Rajendra Choudhary is an approved mining project in Kushalpura, Raipur, Pali, Rajasthan. The site covers 46 acres.
Who is building it?
The applicant is Sandeep Choudhary.
Has it been approved?
Yes. Its status is “Environmental approval granted” (since 25 Mar 2026), as of 27 Nov 2026.
Where is it?
In Kushalpura, Raipur, Pali, Rajasthan.
How big is it?
It has a stated cost of ₹5 crore and a site of 46 acres.
When was it filed?
The application was filed on 8 Aug 2025.
Project details
| Status | Environmental approval granted |
|---|---|
| Status since | 25 Mar 2026 |
| Application filed | 8 Aug 2025 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Mining |
| Applicant | Sandeep Choudhary |
| Land area | 46 acres (18.6 ha) |
| Project cost | ₹5 crore |
| Village / locality | Kushalpura |
| Taluk / tehsil | Raipur |
| District | Pali |
| State | Rajasthan |
| Location from | Site boundary on record |
| Our reference | WID-RJ-27089 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| New project filed 8 Aug 2025 (this page) | Environmental approval granted | 46 acres | ₹5 crore |
| Early planning filed 28 Feb 2025 | Cleared for impact study | 46 acres | ₹5 crore |
In context
1,118 applications in Pali since January 2022 are in the same category (Mining): 623 approved, 93 filed or under review, and 402 withdrawn, lapsed or rejected. The approved ones took a median of 4 months from filing to approval. At 46 acres, this one is larger than 88% of them.
No other mining lease on record is within 500 m of this site; 1 has applied within 5 km.
Where it is
Kushalpura, Raipur, Pali, Rajasthan. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Proposed River Sand (Bajri) Mining Project, Plot No.05, Area – 18.6128 Ha.… — cleared for impact study, 0 m away
- Proposed Rivar Sand (Bajri) Mining Project, Plot No.04, Area – 34.0456 Ha.… — lapsed, 2.6 km away
- Proposed Rivar Sand (Bajri) Mining Project, Plot No.04, Area – 34.0456 Ha.… — cleared for impact study, 2.6 km away
- River Bed Sand Mining Project for production capacity of 56,295.2025 TPA from… — environmental approval granted, 5.6 km away
- River Bed Sand Mining Project for production capacity of 56,295.2025 TPA from… — cleared for impact study, 5.6 km away
- River Bed Sand Mining Project for excavation of 76,938 TPA (Mineral- 76,938… — environmental approval granted, 6.8 km away
- River Bed Sand Mining Project for excavation of 76,938 TPA (Mineral- 76,938… — cleared for impact study, 6.8 km away
- Expressways, Economic Corridors, and Inter Corridors under Bharatmala… — cleared for impact study, 7.3 km away
More from Sandeep Choudhary in Pali
- Proposed Rivar Sand (Bajri) Mining Project, Plot No.04, Area – 34.0456 Ha.… — lapsed
- Proposed Rivar Sand (Bajri) Mining Project, Plot No.04, Area – 34.0456 Ha.… — cleared for impact study
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.