Quick answers
What is this project?
Proposed Project for River Bed Sand Mining (Bajri) Plot no. BJRJD-20 near village: Pipar City, Khudecha & Nann, Tehsil- Pipar City, and District- Jodhpur, for an area is 39.4987 hectare In Favor of Shree Om Banna Construction (Proprietor- Smt. Chanchal Kanwar) is a lapsed mining project in Khudecha, Pipar Shahar, Jodhpur, Rajasthan. The site covers 97.6 acres.
Who is building it?
The applicant is Chanchal Kanwar.
Has it been approved?
No. The application was lapsed on 22 Sept 2026, so it is no longer under consideration.
Where is it?
In Khudecha, Pipar Shahar, Jodhpur, Rajasthan.
How big is it?
It has a stated cost of ₹1.5 crore and a site of 97.6 acres.
When was it filed?
The application was filed on 2 Oct 2025.
Project details
| Status | Lapsed |
|---|---|
| Status since | 22 Sept 2026 |
| Application filed | 2 Oct 2025 |
| Approval sought | Environmental approval |
| Application type | Early planning |
| Sector | Mining |
| Applicant | Chanchal Kanwar |
| Land area | 97.6 acres (39.5 ha) |
| Project cost | ₹1.5 crore |
| Village / locality | Khudecha |
| Taluk / tehsil | Pipar Shahar |
| District | Jodhpur |
| State | Rajasthan |
| Location from | Site boundary on record |
| Our reference | WID-RJ-27152 |
In context
11,954 applications in Jodhpur since January 2022 are in the same category (Mining): 4,406 approved, 210 filed or under review, and 7,338 withdrawn, lapsed or rejected. The approved ones took a median of 7 months from filing to approval. At 97.6 acres, this one is larger than 100% of them.
No other mining lease on record has applied within 5 km of this site.
Where it is
Khudecha, Pipar Shahar, Jodhpur, Rajasthan. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Proposed Standalone Clinker Grinding Unit -50 TPD by Lilan Cement — environmental approval granted, 4 km away
- Re-appraisal of Environmental Clearance granted by DEIAA, Jodhpur (Raj.) of… — environmental approval granted, 6.8 km away
- Sh. Ram Kishore Dudi, M.L. No. 122/1996, Transfer in Environment Clearance… — environmental approval granted, 6.8 km away
- Reappraisal of Earlier Granted EC By DEIAA, Jodhpur (Raj.) Vide Letter No.-… — environmental approval granted, 6.8 km away
- Re-appraisal of Environmental Clearance granted by DEIAA, Jodhpur (Raj.) of… — environmental approval granted, 6.9 km away
- Proposed Enhancement in Existing Production Capacity from 55065 TPA to 137000… — lapsed, 6.9 km away
- "Re-Appraisal Of EC Granted From DEIAA jodhpur To SEIAA Rajasthan Of "Rhyolite… — lapsed, 6.9 km away
- Transfer of Environment Clearance [From Sh. Ram Praksh Dhaka to Sh. Jaswant… — lapsed, 6.9 km away
More from Chanchal Kanwar in Jodhpur
- Proposed Sand Stone (Minor Mineral) Mining Project, Plot No. 209, Area- 1.00… — under environmental review
- Proposed Sand Stone (Minor Mineral) Mining Project, Plot No. 182, Area- 1.00… — lapsed
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.