Project details
| Status | Cleared for impact study |
|---|---|
| Status since | 8 Jul 2025 |
| Application filed | 8 Jul 2025 |
| Approval sought | Environmental approval |
| Application type | Early planning |
| Sector | Mining |
| Applicant | Ugara Ram |
| Land area | 5.2 acres (2.1 ha) |
| Project cost | ₹70 lakh |
| Village / locality | Indawer |
| Taluk / tehsil | Merta |
| District | Nagaur |
| State | Rajasthan |
| Location from | Site boundary on record |
| Our reference | WID-RJ-27300 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| New project filed 12 Oct 2026 | Under environmental review | 5.2 acres | ₹70 lakh |
| Early planning filed 8 Jul 2025 (this page) | Cleared for impact study | 5.2 acres | ₹70 lakh |
In context
2,161 applications in Nagaur since January 2022 are in the same category (Mining): 1,274 approved, 95 filed or under review, and 792 withdrawn, lapsed or rejected. The approved ones took a median of 4 months from filing to approval. At 5.2 acres, this one is larger than 72% of them.
9 other mining leases have applied within 500 m of this site; together with this one they cover 84.8 acres. Under India's environmental rules, mining leases less than 500 m apart are assessed together as one cluster, so the combined area can decide which clearance is needed. 85 mining leases have applied within 5 km.
Where it is
Indawer, Merta, Nagaur, Rajasthan. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- This is a Fresh LOI project for "China Clay(Minor Mineral)mining,"… — under environmental review, 0 m away
- Existing China Clay Mining Lease, ML No- 16/2012, area-4.0 ha, at khasra no.… — under environmental review, 150 m away
- Reappraisal of earlier granted EC by DEIAA, Udaipur,Rajasthan Vide Letter… — lapsed, 300 m away
- Indawar China Clay,area 1.04590 Hect, M.L No. -111/2019 — environmental approval granted, 300 m away
- Indawar China Clay,area 1.04590 Hect, M.L No. -111/2019 — cleared for impact study, 300 m away
- This is an Existing Project for Re-Appraisal of EC Granted from DEIAA NAGAUR… — environmental approval granted, 350 m away
- Re-appraisal of EC granted by DEIAAtoSEIAA in compliance of MoEF&CC O.M. dated… — environmental approval granted, 450 m away
- RE – APPRAISALExisting China Clay (Minor Mineral) mining… — environmental approval granted, 450 m away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.