Project details
| Official title | This is Existing "Masonry Stone (Minor Mineral) mining project" for Re-Appraisal of EC Granted from DEIAA JAIPUR to SEIAA, [M.L.No.-534/2005] over an Area of 1.0 Hectare with Existing Production Capacity–90,920 TPA located at Near Village–Shyampura, Tehsil– Bassi and District– Jaipur (Raj) by Shri Mukesh Kumar Meena S/o Shri Ramsahay Meena |
|---|---|
| Status | Environmental approval granted |
| Status since | 23 Dec 2025 |
| Application filed | 25 Nov 2025 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Mining |
| Applicant | Mukesh Kumar Meena |
| Land area | 2.5 acres (1 ha) |
| Project cost | ₹50 lakh |
| Village / locality | Shyampura |
| Taluk / tehsil | Bassi |
| District | Jaipur |
| State | Rajasthan |
| Location from | Site boundary on record |
| Our reference | WID-RJ-27409 |
In context
1,151 applications in Jaipur since January 2022 are in the same category (Mining): 726 approved, 60 filed or under review, and 365 withdrawn, lapsed or rejected. The approved ones took a median of 5 months from filing to approval. At 2.5 acres, this one is smaller than 97% of them.
4 other mining leases have applied within 500 m of this site; together with this one they cover 16.3 acres. Under India's environmental rules, mining leases less than 500 m apart are assessed together as one cluster, so the combined area can decide which clearance is needed. 7 mining leases have applied within 5 km.
Where it is
Shyampura, Bassi, Jaipur, Rajasthan. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Proposed Masonry Stone Mining Project (Pre-embedded Clearance), Delineated… — environmental approval granted, 150 m away
- New EC For Masonry Stone Mining Lease (M.L. No.519/2005, Area: 1.0 ha),… — lapsed, 200 m away
- "Reappraisal of EC from DEIAA to SEIAA" Existing Masonry stone Mining Project… — environmental approval granted, 300 m away
- "Transfer of EC from Shri Ravindra Sharma to M/s Jai Minesh Stone" Existing… — lapsed, 300 m away
- Expansion in production Capacity from 1,15,960 TPA (ROM) to 6, 50,000 TPA… — more information requested, 900 m away
- Re-Appraisal of DIEAA EC for "Quartz and Quartzite Mining Project, ML No.-… — environmental approval granted, 900 m away
- Proposed Enhancement in Existing Production Capacity from 115960TPA to… — returned to applicant, 900 m away
- S.N. Institute of Medical Science Nirwan University Jaipur — environmental approval granted, 3.5 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.