Quick answers
What is this project?
Proposed Rivar Sand (Bajri) Mining Project,Delineated Plot No-122 (Bajri Plot. No-04),khasra No.-327,331,334,420 &412, area-52.4391 Ha.,Near Village-Sodawas, Tehsil & Dist.-Pali (Raj.) of applicant M/s R.K.Trading Company,Prop. Shree Rajendra Kumar Agarwal is a proposed mining project in Sodawas, Pali, Rajasthan. The site covers 129.6 acres.
Who is building it?
The applicant is Rajendra Kumar Gupta.
Has it been approved?
Yes. Its status is “Cleared for impact study” (since 26 Apr 2025), as of 27 Nov 2026.
Where is it?
In Sodawas, Pali, Rajasthan.
How big is it?
It has a stated cost of ₹9 crore and a site of 129.6 acres.
When was it filed?
The application was filed on 23 Apr 2025.
One of 2 filings for this project. The project's main page, with every filing and where each stands: Proposed Rivar Sand (Bajri) Mining Project,Delineated Plot No-122 (Bajri Plot.…
Project details
| Status | Cleared for impact study |
|---|---|
| Status since | 26 Apr 2025 |
| Application filed | 23 Apr 2025 |
| Approval sought | Environmental approval |
| Application type | Early planning |
| Sector | Mining |
| Applicant | Rajendra Kumar Gupta |
| Land area | 129.6 acres (52.4 ha) |
| Project cost | ₹9 crore |
| Village / locality | Sodawas |
| Taluk / tehsil | Pali |
| District | Pali |
| State | Rajasthan |
| Location from | Site boundary on record |
| Our reference | WID-RJ-27534 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| New project filed 16 Aug 2025 | Environmental approval granted | 129.6 acres | ₹9 crore |
| Early planning filed 23 Apr 2025 (this page) | Cleared for impact study | 129.6 acres | ₹9 crore |
In context
1,118 applications in Pali since January 2022 are in the same category (Mining): 623 approved, 93 filed or under review, and 402 withdrawn, lapsed or rejected. The approved ones took a median of 4 months from filing to approval. At 129.6 acres, this one is larger than 91% of them.
1 other mining lease has applied within 500 m of this site; together with this one they cover 259.2 acres. Under India's environmental rules, mining leases less than 500 m apart are assessed together as one cluster, so the combined area can decide which clearance is needed. 5 mining leases have applied within 5 km.
Where it is
Sodawas, Pali, Rajasthan. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Proposed Bajri/River sand Mining Project, Plot n.-122(Bajri Plot no-.04), with… — lapsed, 300 m away
- Proposed Rivar Sand (Bajri) Mining Project,Delineated Plot No-122 (Bajri Plot.… — environmental approval granted, 350 m away
- Masonry Stone Mining Project ML. No. 90/1998, Area: 1.0 ha, Near… — lapsed, 3 km away
- EC Re-appraisal of Existing Masonry stone Mining Lease (M.L. No. – 90/1998 &… — environmental approval granted, 3 km away
- Proposed Rivar Sand (Bajri) Mining Project, Plot No.121(Bajri Plot No.-03)… — environmental approval granted, 4.4 km away
- Proposed Rivar Sand (Bajri) Mining Project, Plot No.121(Bajri Plot No.-03)… — cleared for impact study, 4.4 km away
- Proposed River Sand (Bajri) Mining Project Plot No.123 (Bajri Plot No. 05,… — environmental approval granted, 4.9 km away
- Proposed River Sand (Bajri) Mining Project Plot No.123 (Bajri Plot No. 05,… — cleared for impact study, 4.9 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.