What is Developing? Open the mapMap

Cleared for impact studyMining · Nagaur, Rajasthan

Existing "Masonry Stone (Minor Mineral) Mining Project" ML. No.- 13/2020 having Expansion in Production Capacity in Earlier Granted Environmental Clearence From-1,20,120 TPA TO 2,19,960 TPA (ROM), {Saleable-1,97,964 TPA & Waste-21,996 TPA} & Addition of Gap Area-0.3318 Hectare(Plot No.-1), total mining Area Of 1.3914 Hectare {ML Area-1.0596 Hectare + Addition of Gap Area-0.3318 Hectare(Plot No.-1)}, Located Near Village– Loadsar, Tehsil- Ladnun, District- Didwana- Kuchaman, (Rajasthan) By Shri

Existing "Masonry Stone (Minor Mineral) Mining Project" ML. No.- 13/2020 having Expansion in Production Capacity in Earlier Granted Environmental Clearence From-1,20,120 TPA TO 2,19,960 TPA (ROM), {Saleable-1,97,964 TPA & Waste-21,996 TPA} & Addition of Gap Area-0.3318 Hectare(Plot No.-1), total mining Area Of 1.3914 Hectare {ML Area-1.0596 Hectare + Addition of Gap Area-0.3318 Hectare(Plot No.-1)}, Located Near Village– Loadsar, Tehsil- Ladnun, District- Didwana- Kuchaman, (Rajasthan) By Shri is a proposed mining project in Lodshar, Ladnu, Nagaur, Rajasthan. The site covers 3.4 acres. Its stated project cost is ₹1.3 crore. As of 27 Nov 2026, its status is “Cleared for impact study” (since 4 Jul 2025).

See it on the live map All projects in Nagaur

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Project details

StatusCleared for impact study
Status since4 Jul 2025
Application filed19 Jun 2025
Approval soughtEnvironmental approval
Application typeEarly planning
SectorMining
ApplicantMohit Sharma
Land area3.4 acres (1.4 ha)
Project cost₹1.3 crore
Village / localityLodshar
Taluk / tehsilLadnu
DistrictNagaur
StateRajasthan
Location fromSite boundary on record
Our referenceWID-RJ-27542

All filings for this project

This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):

FilingStatusLandCost
Expansion filed 7 Aug 2026Under environmental review3.4 acres₹1.3 crore
Early planning filed 19 Jun 2025 (this page)Cleared for impact study3.4 acres₹1.3 crore

In context

2,161 applications in Nagaur since January 2022 are in the same category (Mining): 1,274 approved, 95 filed or under review, and 792 withdrawn, lapsed or rejected. The approved ones took a median of 4 months from filing to approval. At 3.4 acres, this one is larger than 67% of them.

12 other mining leases have applied within 500 m of this site; together with this one they cover 46.1 acres. Under India's environmental rules, mining leases less than 500 m apart are assessed together as one cluster, so the combined area can decide which clearance is needed. 68 mining leases have applied within 5 km.

Where it is

Lodshar, Ladnu, Nagaur, Rajasthan. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.