Project details
| Status | Environmental approval granted |
|---|---|
| Status since | 17 Oct 2026 |
| Application filed | 18 Jul 2025 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Mining |
| Applicant | Commercial Engineers |
| Land area | 9.2 acres (3.7 ha) |
| Project cost | ₹33 crore |
| Village / locality | Fatehabad Ahr |
| Taluk / tehsil | Kishangarh Bas |
| District | Alwar |
| State | Rajasthan |
| Location from | Site boundary on record |
| Our reference | WID-RJ-27723 |
In context
347 applications in Alwar since January 2022 are in the same category (Mining): 131 approved, 47 filed or under review, and 169 withdrawn, lapsed or rejected. The approved ones took a median of 4 months from filing to approval. At 9.2 acres, this one is larger than 92% of them.
2 other mining leases have applied within 500 m of this site; together with this one they cover 25.8 acres. Under India's environmental rules, mining leases less than 500 m apart are assessed together as one cluster, so the combined area can decide which clearance is needed. 2 mining leases have applied within 5 km.
Where it is
Fatehabad Ahr, Kishangarh Bas, Alwar, Rajasthan. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Proposed Masonry Stone Mining Project, Area- 3.9603Ha.(Govt. Land), Delineated… — cleared for impact study, 150 m away
- Proposed Masonry Stone Mining Project, Area- 2.7773ha.(Govt. Land), Delineated… — cleared for impact study, 150 m away
- Regarding Submission of application for EC Transfer of M.L.No. 62/2007 for… — environmental approval granted, 6.3 km away
- Application for Expansion in production capacity from 25,000 TPA to 1,71,550… — lapsed, 6.3 km away
- Re-appraisal of EC granted by DEIAA to SEIAA in compliance of MoEF & CC O.M.… — environmental approval granted, 6.3 km away
- "Reappraisal of EC from DEIAA to SEIAA" Existing Masonry Stone Mining Project,… — environmental approval granted, 6.4 km away
- Application for Expansion in production capacity from 25,064.5 TPA to 1,50,000… — lapsed, 6.5 km away
- Re-appraisal of EC granted by DEIAA to SEIAA in compliance of MoEF & CC O.M.… — environmental approval granted, 6.5 km away
More from Commercial Engineers in Alwar
- Proposed Masonry Stone Mining Project, Area- 3.9603Ha.(Govt. Land), Delineated… — cleared for impact study
- Proposed Masonry Stone Mining Project, Area- 2.7773ha.(Govt. Land), Delineated… — cleared for impact study
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.