What is Developing? Open the mapMap

Cleared for impact studyMining · Jodhpur, Rajasthan

Proposed Project for River Bed Sand Mining (Bajri) Plot no. 148 ( Bajri Plot no.21) for Mineral River Bed Sand (Bajri) near village: Diwandi, Tehsil- Rohat and District: Pali, for an area is 46.8722 hectare in favor of M/S MAA ASHAPURA CONSTRUCTION COMPANY

Proposed Project for River Bed Sand Mining (Bajri) Plot no. 148 ( Bajri Plot no.21) for Mineral River Bed Sand (Bajri) near village: Diwandi, Tehsil- Rohat and District: Pali, for an area is 46.8722 hectare in favor of M/S MAA ASHAPURA CONSTRUCTION COMPANY is a proposed mining project in Bhakhari, Luni, Jodhpur, Rajasthan. The site covers 115.8 acres. Its stated project cost is ₹6 crore. As of 27 Nov 2026, its status is “Cleared for impact study” (since 4 Jul 2025).

See it on the live map All projects in Jodhpur

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Quick answers

What is this project?

Proposed Project for River Bed Sand Mining (Bajri) Plot no. 148 ( Bajri Plot no.21) for Mineral River Bed Sand (Bajri) near village: Diwandi, Tehsil- Rohat and District: Pali, for an area is 46.8722 hectare in favor of M/S MAA ASHAPURA CONSTRUCTION COMPANY is a proposed mining project in Bhakhari, Luni, Jodhpur, Rajasthan. The site covers 115.8 acres.

Who is building it?

The applicant is Madhav Ram.

Has it been approved?

Yes. Its status is “Cleared for impact study” (since 4 Jul 2025), as of 27 Nov 2026.

Where is it?

In Bhakhari, Luni, Jodhpur, Rajasthan.

How big is it?

It has a stated cost of ₹6 crore and a site of 115.8 acres.

When was it filed?

The application was filed on 2 Jul 2025.

One of 2 filings for this project. The project's main page, with every filing and where each stands: Proposed Project for River Bed Sand Mining (Bajri) Plot no. 148 ( Bajri Plot no.21) for…

Project details

StatusCleared for impact study
Status since4 Jul 2025
Application filed2 Jul 2025
Approval soughtEnvironmental approval
Application typeEarly planning
SectorMining
ApplicantMadhav Ram
Land area115.8 acres (46.9 ha)
Project cost₹6 crore
Village / localityBhakhari
Taluk / tehsilLuni
DistrictJodhpur
StateRajasthan
Location fromSite boundary on record
Our referenceWID-RJ-27974

All filings for this project

This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):

FilingStatusLandCost
New project filed 2 Dec 2025Environmental approval granted115.8 acres₹6 crore
Early planning filed 2 Jul 2025 (this page)Cleared for impact study115.8 acres₹6 crore

In context

11,954 applications in Jodhpur since January 2022 are in the same category (Mining): 4,406 approved, 210 filed or under review, and 7,338 withdrawn, lapsed or rejected. The approved ones took a median of 7 months from filing to approval. At 115.8 acres, this one is larger than 100% of them.

No other mining lease on record is within 500 m of this site; 4 have applied within 5 km.

Where it is

Bhakhari, Luni, Jodhpur, Rajasthan. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

More from Madhav Ram in Jodhpur

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.