Quick answers
What is this project?
Proposed River Sand (Bajri) Mining Project, Delineated Plot No. BJRJD- 42 ,Area- 29.9335 Ha.,(Govt. Land) Khasra No.- 38,211 & 236/0, Near Village- Dholeriya Jagir, Dholeriya Sansan & Sajjanpura, Tehsil- Rohat District- Pali (Raj.) of applicant M/s Krishna Construction Company Prop. Smt. Sumitra Devi W/o Shri Mahendra Singh is a proposed mining project in Dholeriya, Rohat, Pali, Rajasthan. The site covers 74 acres.
Who is building it?
The applicant is Sumitra Devi.
Has it been approved?
Yes. Its status is “Cleared for impact study” (since 13 Jun 2025), as of 27 Nov 2026.
Where is it?
In Dholeriya, Rohat, Pali, Rajasthan.
How big is it?
It has a stated cost of ₹1.8 crore and a site of 74 acres.
When was it filed?
The application was filed on 12 Jun 2025.
One of 2 filings for this project. The project's main page, with every filing and where each stands: Proposed River Sand (Bajri) Mining Project, Delineated Plot No. BJRJD- 42 ,Area- 29.9335…
Project details
| Status | Cleared for impact study |
|---|---|
| Status since | 13 Jun 2025 |
| Application filed | 12 Jun 2025 |
| Approval sought | Environmental approval |
| Application type | Early planning |
| Sector | Mining |
| Applicant | Sumitra Devi |
| Land area | 74 acres (29.9 ha) |
| Project cost | ₹1.8 crore |
| Village / locality | Dholeriya |
| Taluk / tehsil | Rohat |
| District | Pali |
| State | Rajasthan |
| Location from | Site boundary on record |
| Our reference | WID-RJ-28207 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| Amendment filed 23 Dec 2025 | Cleared for impact study | 74 acres | ₹2.5 crore |
| Early planning filed 12 Jun 2025 (this page) | Cleared for impact study | 74 acres | ₹1.8 crore |
In context
1,118 applications in Pali since January 2022 are in the same category (Mining): 623 approved, 93 filed or under review, and 402 withdrawn, lapsed or rejected. The approved ones took a median of 4 months from filing to approval. At 74 acres, this one is larger than 89% of them.
No other mining lease on record is within 500 m of this site; 3 have applied within 5 km.
Where it is
Dholeriya, Rohat, Pali, Rajasthan. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Proposed River Sand (Bajri) Mining Project, Delineated Plot No. BJRJD- 42… — cleared for impact study, 0 m away
- Proposed River Bed Sand Mining (Bajri) Project at Plot No.41, khasra -47 near… — under environmental review, 1.4 km away
- Proposed River Bed Sand Mining (Bajri) Project at Plot No.41, khasra -47 near… — under environmental review, 1.4 km away
- Proposed River Bed Sand Mining (Bajri) Project at Plot No.41, khasra -47 near… — cleared for impact study, 1.4 km away
- Proposed Project River Sand Mining Project Lease Area 91.2888 hect. Plot No.… — lapsed, 2.9 km away
- Proposed Project for River Bed Sand Mining (Bajri) Plot No.40 for Mineral… — under environmental review, 3.4 km away
- Proposed River Sand (Bajri) Mining Project, Plot No. BJRJD – 39, Area- 32.9465… — lapsed, 5.4 km away
- Proposed River Sand (Bajri) Mining Project, Plot No. BJRJD – 39, Area- 32.9465… — cleared for impact study, 5.4 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.