Quick answers
What is this project?
proposed of Quartz & Feldspar (Minor Mineral) Mining project [M.L. No.-36/2011, Khasra No.- 3700/2, 3702/1, 3702, 2703, 3705, 3706, 3707, 3689 3714/1, 3714/2, 3714/3, 3715, 3718, 3716/4274,3701, over an area 4.1064 ha. located near Village- Bavari, Tehsil- Todaraising Distt- Tonk, (Rajasthan) with production capacity 2,33,470 TPA (ROM) by M/s Shre Balaji Minerals Suppliers is a lapsed mining project in B>Vri, Todaraisingh, Tonk, Rajasthan. The site covers 10.2 acres.
Who is building it?
The applicant is Sunil kumar.
Has it been approved?
No. The application was lapsed on 30 Sept 2024, so it is no longer under consideration.
Where is it?
In B>Vri, Todaraisingh, Tonk, Rajasthan.
How big is it?
It has a stated cost of ₹2.5 crore and a site of 10.2 acres.
When was it filed?
The application was filed on 30 Sept 2024.
One of 2 filings for this project. The project's main page, with every filing and where each stands: proposed of Quartz & Feldspar (Minor Mineral) Mining project [M.L. No.-36/2011, Khasra…
Project details
| Status | Lapsed |
|---|---|
| Status since | 30 Sept 2024 |
| Application filed | 30 Sept 2024 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Mining |
| Applicant | Sunil kumar |
| Land area | 10.2 acres (4.1 ha) |
| Project cost | ₹2.5 crore |
| Village / locality | B>Vri |
| Taluk / tehsil | Todaraisingh |
| District | Tonk |
| State | Rajasthan |
| Location from | Site boundary on record |
| Our reference | WID-RJ-28399 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| New project filed 3 Apr 2025 | Not approved | 10.2 acres | ₹2.5 crore |
| New project filed 30 Sept 2024 (this page) | Lapsed | 10.2 acres | ₹2.5 crore |
In context
362 applications in Tonk since January 2022 are in the same category (Mining): 227 approved, 30 filed or under review, and 105 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 10.2 acres, this one is larger than 74% of them.
No other mining lease on record has applied within 5 km of this site.
Where it is
B>Vri, Todaraisingh, Tonk, Rajasthan. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Proposed of Quartz & Feldspar (Major Mineral) Mining project [M.L.… — more information requested, 0 m away
- Proposed of Quartz & Feldspar (Major Mineral) Mining project [M.L.… — cleared for impact study, 0 m away
- proposed of Quartz & Feldspar (Minor Mineral) Mining project [M.L.… — not approved, 0 m away
- Shri Suresh Chandra Sharma S/o Shri Ramkishan Sharma, M.L No.- 05/2009, Near… — environmental approval granted, 9 km away
- Proposed Granite Mining Project Ref. No.20221000067442 Area3.2347Ha, Near… — environmental approval granted, 10.7 km away
- Approval of Final EIA/EMP report for "Granite Cluster Mining Project", Ref… — environmental approval granted, 13 km away
- Granite Cluster Mining Project of Ref. No.- 20221000053880, Area- 1.0005Ha.,… — cleared for impact study, 13.7 km away
- Granite Cluster Mining Project of Ref. No.- 20221000053880, Area- 1.0005Ha.,… — environmental approval granted, 13.7 km away
More from Sunil kumar in Tonk
- Proposed of Quartz & Feldspar (Major Mineral) Mining project [M.L.… — more information requested
- Proposed of Quartz & Feldspar (Major Mineral) Mining project [M.L.… — cleared for impact study
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.