Environmental approval grantedBuildings & townships · Jaipur, Rajasthan

Solar Module Manufacturing Plant (4.5 GW)

Solar Module Manufacturing Plant (4.5 GW) is an approved industrial building project in Sawarda, Mauzamabad, Jaipur, Rajasthan. The site covers 24.9 acres. Its stated project cost is ₹158 crore. As of 27 Nov 2026, its status is “Environmental approval granted” (since 2 Feb 2026).

See it on the live map All projects in Jaipur

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Project details

Official titleSolar Module Manufacturing Plant (4.5 GW) at Near Village- Sawarda, Tehsil- Mauzamabad, Dist.-Dudu, Rajasthan
StatusEnvironmental approval granted
Status since2 Feb 2026
Application filed4 Oct 2025
Approval soughtEnvironmental approval
Application typeNew project
SectorBuildings & townships
ApplicantInsolation Green Energy Private Limited
UseIndustrial
Parking spaces399
Land area24.9 acres (10.1 ha)
Built-up area65,710 m² (7,07,296 sq ft)
Plot area1,00,792 m² (10,84,915 sq ft)
Project cost₹158 crore
Village / localitySawarda
Taluk / tehsilMauzamabad
DistrictJaipur
StateRajasthan
Location fromSite boundary on record
Our referenceWID-RJ-28754

In context

284 applications in Jaipur since January 2022 are in the same category (Buildings & townships): 196 approved, 45 filed or under review, and 42 withdrawn, lapsed or rejected. The approved ones took a median of 4 months from filing to approval. At 24.9 acres, this one is larger than 84% of them.

28 other applications of any kind have been filed within 5 km of this site since January 2022.

Where it is

Sawarda, Mauzamabad, Jaipur, Rajasthan. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

More from Insolation Green Energy Private Limited in Jaipur

All 4 Insolation Green Energy projects across India

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.